Newmont attributed the lower production to the processing of lower grade ore from stockpiles as it prepared for a new phase of mining at the vast open pit in the mountains of Sumbawa.
Newmont has attributed the lower production to the processing of lower grade ore from stockpiles as it prepares for a new phase of mining at the vast open pit in the mountains of Sumbawa.
Asfor the Mining Boom III, the pick up in export volumes flowing from the surge in mining investment in iron ore, coal and liquid natural gas will start to get underway around 2014-15.