The technology based on the precise engineering survey has been adopted to control the key parts' assembly position of EAST tokamak.
采用精密工程测量技术对EAST装置主机关键部件装配位置进行了装配过程检测,并建立了相应的测量控制网。
To avoid plague second transportation and for the convenience of assembly, steel members should be laid down near assembly position.
构件的平面布置和堆放宜在安装位置附近道路上,这样可以免去二次搬运的麻烦,也为结构吊装带来便利。
With application of the appropriate survey plans, the key parts assembly position design precision in the EAST device has been ensured.
通过利用合适的控制测量方案,使得EAST装置关键部件的装配位置精度达到了设计要求。
With application of the appropriate survey plans, the key parts assembly position design precision in the EAST device has been ensured.
通过利用合适的控制测量方案,使得EAST装置关键部件的装配位置精度达到了设计要求。
应用推荐