• Project engineer also should through the detail drawing and the assembly drawing, carries on the consultation together with the branch of manufacture to the finally design proposal.

    设计工程师应该通过零件装配图制造部门一起最终设计方案进行磋商

    youdao

  • The factory owns senior design and process assembly engineer name, and according to project and OEM professional channels of large-scale production.

    工厂拥有资深设计工艺装配工程师多针对工程项目OEM专业渠道进行规模化生产

    youdao

  • Work close with sales and project engineer as well with the other project team (control engineering, electrical design, manufacturing, mechanical assembly).

    销售项目工程师控制工程师电气设计制造机械装配紧密合作

    youdao

  • The drifting rack is used for the storage of assembly line position. The materials slide down upon its own gravity, the bevel accessing for materials is more suitable for human engineer design.

    流利式货架适用生产线共位存放物料箱靠重力沿滚轮下滑,物料斜面存取符合人体工程设计

    youdao

  • The drifting rack is used for the storage of assembly line position. The materials slide down upon its own gravity, the bevel accessing for materials is more suitable for human engineer design.

    流利式货架适用生产线共位存放物料箱靠重力沿滚轮下滑,物料斜面存取符合人体工程设计

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定