• The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data.

    根据实测地形水文泥沙资料,分析了葛洲坝枢纽运用宜昌河段河床冲淤变化、推移质和沙的粗化以及枯水位变化。

    youdao

  • The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data.

    根据实测地形水文泥沙资料,分析了葛洲坝枢纽运用宜昌河段河床冲淤变化、推移质和沙的粗化以及枯水位变化。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定