This article describes a detailed analysis phase.
本文详细描述分析阶段。
What are the tools used in the analysis phase?
什么是在分析阶段使用的工具?
This can be done during the semantic analysis phase of the compilation.
这可以在编译的语法分析阶段完成。
If you were performing a study, the project might end after the analysis phase.
如果你在做一项研究,在做完分析阶段的任务后,这个项目可能就会结束了。
The starting point of a development project is the requirements analysis phase.
开发项目的起始点是需求分析阶段。
However, many issues still exist in validating models during the analysis phase.
但是,分析阶段确认模型仍然存在许多问题。
In this phase, you design candidate services that you identified in the analysis phase.
在此阶段,您将设计在分析阶段确定的候选服务。
The analysis phase focuses on gathering information to help better understand the project.
分析阶段主要关注收集信息以便更好地理解项目。
The result of the validation of a model can have a few consequences over the analysis phase.
模型确认的结果对分析阶段会产生一定的影响。
This is the work that is essentially done in the business analysis phase of the project execution.
这是在项目执行的业务分析阶段主要完成的工作。
The analysis phase was viewed as an opportunity to perform optimization and to detect certain kinds of errors.
分析阶段被视作是执行优化和检测某种错误的机会。
We understand that problems are highlighted through the application, but the analysis phase shouldn't stop there.
我们知道Domino让问题凸显出来,但不能将分析停留在这个阶段。
Capturing the semantic of temporal conditions is a very important task of the rule analyst during the analysis phase.
捕捉时间条件的语义是规则分析师在分析阶段的一项非常重要的任务。
For example, sequence diagrams for Harmony Functional Analysis Phase or Architectural Design Phase can be used for test cases.
例如,结构性设计阶段或者协调功能性分析阶段中的序列图,可以用于测试用例。
As we add more scenarios, we'll complete the use case, at least so far as the analysis phase of the development cycle is concerned.
至少就这个开发循环的分析阶段而言,当我们添加方案时,我们将完成这个用例。
The outcome of the analysis phase is a metaclass model that describes candidate services, their role stereotypes, and their operations.
分析阶段的产物是一个元类模型,此模型描述候选服务、候选服务的角色构造型及其操作。
Thus, the eventual errors of the analysis phase can be detected quite early, without any of the notorious impact on development planning.
因此,分析阶段最终的错误可以尽早地检查到,而不用对开发规划造成什么大的影响。
Frequent demonstrations, a rich analysis phase, and involvement from our usability expert all contributed to the ease of use in the final system.
频繁的演示,丰富分析的阶段,和可用性专家的介入都对最终系统的易用性作出了贡献。
If the software steering committee considers the project feasible, then the project proceeds to the analysis phase, otherwise, the project is ended.
如果软件指导委员会认为项目是可行的,那么这个项目进入到分析阶段,否则就取消项目。
The principal objective of the systems-analysis phase is the specification of what the system needs to do to meet the requirements of end users.
系统分析阶段的主要目的是详列系统必须要符合用户的哪些需求。
During the existing assets analysis phase of SOMA identification, any existing assets that are present are checked to see if they can be reused as they are.
在SOMA标识的现有资产分析阶段,将检查存在的任何现有资产,以确定是否可以按原样对它们进行重用。
At present, most power plants in the chemical monitoring, thermal companies also remain in the job run manual meter reading, manual data analysis phase.
而目前大部分发电厂化学监督、热力公司运行工作还停留在人工抄表、人工数据分析阶段。
Feature models are widely used in the SPL requirements commonality and variability analysis phase to model all possible configurations of SPL member applications.
SPL需求共性和可变性分析阶段广泛使用功能模型来对SPL成员应用程序的所有可能配置建模。
You can analyze choreography models produced in the analysis phase to determine which services need to be built from scratch and the existing services you can use.
您可以对分析阶段产生的编排模型进行分析,以确定哪些服务需要从头构建,以及可以使用哪些现有的服务。
Most of the "actors" that appear at this level will be identified by at least one attribute; otherwise they are not interesting to the system in the analysis phase.
在这个层次上出现的大多数“参与者”都将至少由一个属性标识;否则它们就是系统在分析阶段时所不感兴趣的参与者。
At present, there are some conception confusions about organization, team and group, and also team formation is still in qualitative analysis phase in multi-robot field.
目前在多机器人领域,对组织、团队和群体概念比较混乱,团队形成的研究大都停留在定性分析阶段。
This is useful to make a linkage and validate the relations between the Personas and the actual system actors that are determined (or possibly reverse-engineered) during the analysis phase.
建立连接并验证角色和分析阶段中确定的(或者可能是反向工程)实际系统参与者之间的关系是有用的。
Using fire fighting supervising system as an example, this paper exhibits the dependency relations of design phase model and requirement analysis phase model in software build phase by UML.
本文以消防监督检查系统为实例,展示了UML在进行软件设计构造阶段中,设计阶段模型和需求分析阶段模型之间的依赖关系。
In the requirement analysis phase, the article briefly introduced the concept of requirement analysis, discussed two main requirement analysis technologies - use case model and domain model.
在需求分析部分,简要介绍了需求分析的概念,讨论了两种主要的需求分析技术——用例模型和领域模型。
A great deal of effort went into defining the kinds of checks that could be performed during the analysis phase and in deciding which of these checks should be required and which should be permitted.
我们做了大量工作来定义在分析阶段执行的各种检查,以及确定哪些检查是必要的,而哪些是可允许的。
应用推荐