The most important problem of the construction enterprise is the construction cost control, and the construction cost control can be divided into advance control, course control and after control.
施工企业最突出的问题是施工成本控制,施工成本控制可分为事先控制、事中控制(过程控制)和事后控制。
Chapter 6 in this dissertation studies the change of accounting performance after control transfer.
本文的第六章研究了控制权转移导致的会计业绩变化。
The whole process of supervision is the quality of a project control things in pre-control, mid-control and after control.
全过程监理是对某项工程质量的事前控制、事中控制、事后控制。
This thesis conducts research on the relationship between controlling shareholder and benefits expropriation by large shareholder after control transfers.
控股股东侵占行为是困扰世界各国公司治理的核心问题,是公司治理理论研究的前沿课题。
Pre-control means the control of the project preparation stage, mid-control is the control of the construction process, after control means after the end of the project quality control.
事前控制是指对工程准备阶段的控制,事中控制是指对工程施工过程的控制,事后控制是指工程结束后质量的控制。
After control system modification, the running reliability of the dryer was increased, the stability of processing parameter was ensured, and cut tobacco quality was improved obviously.
改进后提高了设备运行的可靠性,确保了烘丝机工艺参数的稳定,制丝质量也得到明显改善。
The grey modeling and the idea of pre-control in grey prediction control theory can well remedy the defects of exact linearization and after-control in linear optimal control theory.
灰色预测控制理论中灰色建模和“超前控制”的思想较好地弥补了线性最优控制理论中精确线性化和“事后控制”的不足。
The grey modeling and the idea of pre-control in grey prediction control theory can well remedy the defects of exact linearization and after-control in linear optimal control theory.
灰色预测控制理论中灰色建模和“超前控制”的思想较好地弥补了线性最优控制理论中精确线性化和“事后控制”的不足。
应用推荐