• The latter is activity cost, and it can be summed up by the activity cost pool of perception, launching, design, actualizing and consolidating.

    后者为变革作业成本,具体通过认知成本、发动成本、设计成本、实施成本、完善成本五个作业成本池进行归集。

    youdao

  • The fifth step is to calculate the distribution ratio of the activity driver and distribute the activity cost to different objects of cost calculation.

    计算作业动因分配率,将作业成本分配至不同的成本计算对象。

    youdao

  • A transfer pricing system based on standard activity cost with capacity constraints is proposed with quantitative study which can induce the divisions' production and purchasing decisions.

    以模型化方法定量研究了作业生产能力约束下的标准作业成本基础转移定价方法,可实现对企业内各分部生产采购决策的有效引导。

    youdao

  • A transfer pricing system based on standard activity cost with capacity constraints is proposed with quantitative study which can induce the divisions' production and purchasing decisions.

    以模型化方法定量研究了作业生产能力约束下的标准作业成本基础转移定价方法,可实现对企业内各分部生产采购决策的有效引导。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定