• RUP USES a master test plan for the overall project and an iteration test plan per iteration.

    RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。

    youdao

  • These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).

    这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。

    youdao

  • The master test plan and a detailed planning of test effort should be all that is produced prior to test execution.

    主测试计划和测试工作的详细计划,应当是在测试执行之前所产生的所有文档。

    youdao

  • One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test.

    一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。

    youdao

  • One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test.

    一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。