• Wellbore stability, hole cleaning, toque and drag are key factors in extended reach well drilling of Xijiang 24 - 3 - A14.

    西江24—3—A14大位移井的摩阻与扭矩、井眼稳定性及井眼清洁是钻井成功与否的关键因素。

    youdao

  • Rooster tells of his meeting with a 90-foot giant (" Just off the A14 outside Upavon. About half a mile from the Little Chef ").

    “雄鸡”述说着他如何偶遇90英尺高的巨人(就在阿佩文之外的A14,离小切辅还有半英里)。

    youdao

  • The design and construction situations of A14 testing section soft soil roadbed on Qinhuangdao-Shenyang passenger transport special railway line are introduced.

    介绍了秦沈客运专线A14试验段软土路基工程设计施工情况。

    youdao

  • The design and construction situations of A14 testing section soft soil roadbed on Qinhuangdao-Shenyang passenger transport special railway line are introduced.

    介绍了秦沈客运专线A14试验段软土路基工程设计施工情况。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定