• 建立了高温高压井预测esd积分模型

    The integrating model of ESD has been established.

    youdao

  • 由于地层复杂,高温高压井测试施工成功率

    For complicate formation condition and well situation, the successful ratio of well test for HP-HT well is much low.

    youdao

  • 文章方法高温高压结构设计套管强度设计有一定的指导作用。

    The method could instruct well structure design and casing intensity design in HP/HT wells.

    youdao

  • 在对高温高压进行身结构设计时必须考虑测试期间存在隐患才能保证套管安全

    Only the hidden trouble existing in the testing stage has been considered in designing the casing program for the high temperature and high pressure well, can the casing safety be guaranteed.

    youdao

  • 高压电缆密封控制系统泄流、不放维持正常注水条件下进行密闭测试

    The wellhead high pressure wireline control system can conduct close-in tests without bleeding off fluid and pressure, and keeping normal subsurface water injection.

    youdao

  • 屯河组及其以上地层2北东埋藏地区早期形成异常高压勘探的有利目标

    The exploration targets include the Toutunhe Formation and the above strata, the shallow - burial area toward northeast of Dong 2 well, and the early - formed abnormal pressure belts.

    youdao

  • 最后根据渗流力学原理建立了更加完善高压充填防砂产能预测模型

    At last, the productivity predicting model of the high-pressure packing sand-control well with the transitional zone is established based on the fluid mechanics in porous medium.

    youdao

  • 运用数值模拟方法分别模拟异常高压气藏常压气藏一口进行衰竭式开发生产数据,对本文方法进行了验证

    Simulating the production data of a depletion drive well in abnormally pressured gas reservoir and normal gas reservoir by Eclipse to validate new way in this paper.

    youdao

  • 本文研究了异常高压油藏稳定渗流规律建立了利用系统资料求取渗透率变化系数方法

    The paper studied stable seepage flow rule of overpressure reservoir and created the method for using systematic well testing data to compute permeability variation coefficient.

    youdao

  • 此基础上,分析渗透率模量变化气藏压力产量影响,分析应力敏感性高压气藏流入动态。

    Then, the influence of the permeability modulus on the pressure and production of gas reservoirs and the inflow performance of stress-sensitive gas Wells with high pressure are analyzed.

    youdao

  • 本文利用JHDS高温高压失水仪,在确定实验参数条件规定了评价各种流体油气损害程度模拟评价程序

    JHDS HTHP Dynamic Filtration Press is used to evaluate the damage to oil-gas formation according to specific simulation evaluation program for each kind of fluid under definite test parameters.

    youdao

  • 减压成熟技术用于墨西哥海湾这样高压油气收效甚微,施工周期过长

    Relief well is a more mature technology, However, this high pressure for the Gulf of Mexico oil and gas Wells, Small effective, and long construction period.

    youdao

  • 二连油田阿南区块由于长期注水,油气层出现明显异常高压,地层原始压力遭到破坏,造成了等复杂事故。

    Abnormal high pressure systems have formed in Anan Block of Erlian oilfield due to long time of water flooding, kicks, lost circulation and hole collapse are frequently encountered.

    youdao

  • 管外高压充填防砂技术通过液量地带形成半径、高渗透的挡砂屏障;

    A sand retention screen with large radius and high permeability near the wellbore can be formed by high liquid production and the large amount of sand.

    youdao

  • 利用高压模拟条件石英颗粒变化情况,研究吞吐过程中水岩反应稠油储层影响

    This paper studies effect of water-rock reaction on heavy oil reservoir during steam soaking in single well by modeling changement of quartz particle in autoclave under thermal recovery condition.

    youdao

  • 有的异常高压油、由于设备技术条件限制而不能无法获得不稳定测试资料

    Shut in pressures of some oil-gas wells with abnormal high pressure can not be tested as the limitation of equipment and technique conditions to fail in getting test data.

    youdao

  • 16高压射孔完压力恢复曲线统计可知,14表皮系数负值

    From the pressure buildup curve of 16 Wells who used over-high pressure, the skin factor of 14 Wells is negative.

    youdao

  • 首次提出深层高压油藏采用分支技术降低成本提高开发效益调整手段

    A new adjustable way was developed first time which use cluster well to decrease drilling cost and increase benefit in deep imbedded, low permeability, high pressure reservoir.

    youdao

  • 针对高压油气特点,注水泥时常采用高密度盐水泥浆

    In consideration of the characteristics of high pressure salt bed cementing of oil and gas Wells, high density salt slurry is often used for cementing.

    youdao

  • 套管外封隔器用于高压、恶性开漏等复杂情况使质量有所提高。

    The outer casing packer can be used in the troublesome Wells in which the high pressure gas channeling and the loss of circulation occur, to improve the cementing quality.

    youdao

  • 高压节能潜油电机解决电泵生产过程用电量大、采油成本高等问题开发研制而

    The high-voltage energy-saving submersible motors are developed for solving such problems as high electric quantity and high oil recovery costs consuming during working process of electric pump wells.

    youdao

  • 排水采气技术是通过地面高压天然气注入中,利用气体能量逐级举升中的液体,使恢复生产能力

    Gass lift drainage gas recovery by gas lift valve, from the ground to high-pressure gas injection stop injection Wells, the gas energy gradually lift shaft in the liquid, the well production capacity.

    youdao

  • 闸板防喷器速度快、耐高压二级重要设备

    The ram BOP is the most important equipment for secondary well control, quick to shut in the well, and of a high pressure rating.

    youdao

  • 为了封堵中原胡庆油田高压地带层,研制了双液法堵LF 1。

    A two-component indepth profile modifying agent, LF-1, is prepared for plugging high permeable channellings in further bore zones of high pressure water injection Wells in Huqing, Zhongyuan.

    youdao

  • 排水采气技术是通过气举地面高压天然气注入中,利用气体能量逐级举升中的液体,使恢复生产能力

    Gass lift gas lift valve from the ground, the high-pressure gas injection Wells stop the pump, use of gas energy to lift the liquid in the wellbore, the well to restore production capacity.

    youdao

  • 通过地面高压气体注入泵的中,利用气体的能量举升液体,使恢复生产能力

    Gass lift drainage gas recovery by gas lift valve, from the ground to high-pressure gas injection stop injection Wells, the gas energy gradually lift shaft in the liquid, the well production capacity.

    youdao

  • 气举是通过气地面高压气体注入中,利用气体的能量举升液体使恢复生产能力

    Gass lift gas lift valve from the ground, the high-pressure gas injection Wells stop the pump, use of gas energy to lift the liquid in the wellbore, the well to restore production capacity.

    youdao

  • 这些不太理想结果主要由于先期设计理念和油流速率限制,而油流速率则由于其进行了限制。

    The poor results, though, were thought to be from a combination of early design learnings and rate restrictions because of maximum-pressure limitations of the completion.

    youdao

  • 实践认为,这套压裂方法行之有效的,能够正确指导压裂设计裂施工成功率

    It is proved by site practices that the method is effective and can guide fracturing design and increase success ratio of fracturing operation.

    youdao

  • 段长、高温高压延迟情况特点要求泥浆一定时期保持性。

    It takes some question, such as: long hole, HTHP, solidity delay. Those instance and characteristic require cement slurry kept pumpability in a given time.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定