为此,小农制定了(事前)风险管理和(事后)风险应对战略。
In response to this, smallholders have developed strategies for (ex ante) risk management and (ex post) risk coping.
风险应对策略包括风险规避、风险降低、风险接受和风险转移。
Methods for dealing with risk include risk avoidance, risk reduction, risk acceptance, and risk transference.
然后,对风险进行分类识别、系统分析,提出了风险应对的主要措施。
Then, the article carries on the classified recognition and the system analysis to the risk and proposed the main risk response measures.
风险响应措施的选择是在成本效益原则的基础上选择最优的风险应对方案。
The risk of response is defined as selecting the optimal one among the feasible proposals on the basis of the principle of cost-effective.
针对重要性不同的风险因素,会计师事务所应该采取不同的风险应对措施。
Facing the different importance of risk factors, the public accounting firms should adopt different treatments.
文章对房地产开发各阶段的风险进行风险识别、风险评估、风险应对的研究。
The paper makes a deep research to the risk of real estate processes, including risk identification, risk evaluation, risk response.
为民俗文化商业街改造工程项目的风险识别和风险应对的管理准备了理论基础。
Commercial Street for the transformation of folk culture project risk identification and risk management should prepare a theoretical basis.
然后以堵住风险源头为目标制定风险应对措施,使风险应对措施更具有针对性。
And then make the response measures of risk to block the risk source as objectives, the response measures of risk could be more specific.
学校体育活动伤害事故的风险管理由风险识别、风险评估与风险应对三个部分组成。
The risk of accident of injury during the school physical action it is risk come into birth during the physical action.
本文通过实证分析证明所建评价模型的有效性,并针对所评价项目给出风险应对计划。
The availability of evaluation model is proved in the part of empirical analysis and some risk response planning of case project are put forward.
正如本报告所分析的,将重点放在风险之间的相互关联上,对研究相应的风险应对机制起到重要作用。
Analyses such as the one provided in this report that focus on risk interconnections therefore play an important role at focusing the debate on risk response.
分析、跟踪并监视项目风险,确保及时识别风险,报告其状态,执行适当的风险应对计划。
Analyzing, tracking, and monitoring project risks to make sure the risks are identified, their status is reported, and that appropriate risk response plans are being executed.
贫困者的另一项重要能力是风险应对,即尽管收入波动,通过减少消费变化,事后应对冲击。
Another important capacity for the poor is risk coping, i.e. dealing with shocks ex-post by reducing variability in consumption in spite of income fluctuations.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
最后,根据体育赛事所面临的风险等级状况提出相应的风险应对策略,以确保赛事的成功举办。
At last, based on the faced rank of risk in sports events, the corresponding risk countermeasure was posed to ensure the success of sports events.
建立了评价指标体系,构造了一个基于层次分析法与模糊数学基础上的风险应对方案模糊评价模型。
In the part of risk answer, I spend plentyful energy in find the answer to the risk , found assessment index, construct a fuzzy evalution mode based on AHP and fuzzy maths.
基于风险因素的多维特性,建立了评价风险因素优先度以及选择风险应对措施的层次分析法结构模型。
A risk rating sequencing and a structure model of AHP of counter-measure were set up, based on the multi-attribute of risk factors.
论文将进度预警模型应用于DS水闸枢纽工程,给出了进度点的警情值,从而为风险应对提供了理论依据。
The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.
另外,我们也可以通过增加项目风险管理能力、风险应对或承受能力、项目管理成员素质来减免风险因素。
In addition we can through increase project risk managerial ability, merit of project manager, reduce or remit the risk factor too.
将风险值域设定的来因造成笔墨挤素识嚏险里挡钅一个重要的组成部门,它有助于提出有效的风险应对战略。
Risk range set by the written reasons for the formation of face-to-face risk is an important part of it will help come up with effective strategies to deal with risks.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
监管者应找出有效方法配合公司应对不同风险,而银行则自然而然的是信贷风险应对者,因为他们深谙如何评估债务人。
Regulators should also find ways to match different risks with the firms which can best bear them. Banks are the natural bearers of credit risk since they know about evaluating borrowers.
第二方面提出了高速公路贷款项目风险管理的五个环节,即项目风险识别、项目风险估计、项目风险评价、项目风险应对和项目风险监控。
The second aspect puts forward five processes of expressway project risk management. They are identification, estimate, evaluation, response, scrutiny and control of project risk.
总结:所有的小组开会介绍各自的工作,总结进度,提出并解决问题和困难,增加新的待定项。在会上总结风险,定义适当的风险应对策略。
Review: All teams meeting to present work and review progress, raising and resolving issues and problems, adding new backlog items. Risk is reviewed and appropriate responses defined.
基于风险评估结果,系统地研究广旺公路建设项目风险应对策略,并建立相应的风险控制体系,从而为项目建设中有效规避和控制风险提供直接指导。
Acoording to the result of risk evaluation, the risk control strategies and system are researched and supposed for Guangwang Road Project, which can effectively help to reduce and avoid risk loss.
买保险可以应对此类风险。
Insurance can be purchased to provide protection against such risks.
在去年12月发表的一封公开信中,数百名科学家、作家和学者向人类发出了警告:政策制定者和我们其他人必须公开应对全球崩溃的风险。
Hundreds of scientists, writers and academics sounded a warning to humanity in an open letter published last December: Policymakers and the rest of us must engage openly with the risk of global collapse.
在2004年出版的《灾难:风险与应对》一书中,我讨论了一些灾难发生的可能性。
In my 2004 book Catastrophe: Risk and Response, I discussed a number of disaster possibilities.
在2004年出版的《灾难:风险与应对》一书中,我讨论了一些灾难发生的可能性。
In my 2004 book Catastrophe: Risk and Response, I discussed a number of disaster possibilities.
应用推荐