• 分析主要考虑电网负载历史清算价格因素

    The analysis main consider the factors like grid-connected wind power, load and historical clearing price.

    youdao

  • 自重以及正常磕碰等内、外力相联系负载条件下保温层不致别离掉落

    In wind resistance than normal, self-respect, and knock against bare and associated external load conditions, thermal insulation layer is not with the bottom separation, fall off.

    youdao

  • 作用巨大叶轮负载下,塔架合理受力、合理选型等问题凸显出来。

    Bearing tremendous wind loads and minus loads of rotors, the problem of rational configuration for wind turbine towers naturally arises.

    youdao

  • 为增强直驱型变速恒频系统电压穿越能力,采取了变流器直流侧增加负载以在故障消耗掉直流侧多余的能量,使机组的正常运行基本电压跌落影响的应对措施。

    By adding damp load at DC-side of the converter, redundant energy at DC-side during grid faults will be consumed, therefore the operating of wind turbine will not be influenced by grid voltage sags.

    youdao

  • 为增强直驱型变速恒频系统电压穿越能力,采取了变流器直流侧增加负载以在故障消耗掉直流侧多余的能量,使机组的正常运行基本电压跌落影响的应对措施。

    By adding damp load at DC-side of the converter, redundant energy at DC-side during grid faults will be consumed, therefore the operating of wind turbine will not be influenced by grid voltage sags.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定