• 比如可能商业规模到处建立风电场太阳能发电因为美国有些地区风力不足日照不够,无法生产足够电力

    For example, it is not possible to install wind or solar plants on a commercial scale everywhere because some areas of the country are just not windy or sunny enough to yield enough power.

    youdao

  • 华能新能源中国第三风电场运营商发电能力全国风力发电6%。

    Huaneng Renewables is the third-largest wind farm operator in China, generating about 6 per cent of the country's wind power.

    youdao

  • 基于广东徐闻洋前风电场工程,对风力发电机组塔架基础设计进行研究

    This paper researches the design of wind turbine generators tower foundation based on the project of Xuwen Yangqian wind power plant in Guangdong.

    youdao

  • 随着信息技术风力发电中的应用风电场SCADA系统安全访问控制变得越来越重要

    With the application of information technology in wind power generation, secure access control of SCADA system for wind power farm becomes more and more important.

    youdao

  • 由于实际风电场实验研究费时费力、实验费用昂贵因此必要实验室条件建立变速恒频双馈风力发电物理模拟系统

    It is necessary to establish VSCF doubly-fed wind power physical simulation system in the laboratory, as the actual wind experiment research is expensive and time-consuming.

    youdao

  • 目前风电接入电网出现了与以往不同特点表现:(1)单个风力发电容量增大(2)风电场接入电网的电压等级更高

    Currently, there are some noticeable characteristics of the wind power integration behaving as following: (1) each single wind farm with larger size; (2) wind farm coupled with higher voltage level.

    youdao

  • 风力发电最大注入功率分析风电场规划运行一项重要内容

    The analysis of maximum power injection of wind farm is an important issue in the planning and operation of wind farm.

    youdao

  • 根据我们预测未来5 ~7年间大部分风电场建设所采用的风力发电会是异步风机

    We estimate that over the next 5 to 7 year, most of wind turbines will be double fed induction wind turbines.

    youdao

  • 重点介绍了目前风电场中所采用的风力发电机组,包括风力机、风力功率调节及恒速恒频变速恒频系统

    The main topics mentioned here are about wind turbine, power regulation of wind turbine and induction generator in wind farms with electrical power system.

    youdao

  • 介绍一种基于PLC风力发电主控单元适于风电场集群控制有效方法

    This paper introduces an effective method suitable for wind farm central control which USES PLC as the wind turbine generators main control unit.

    youdao

  • 根据分布了解风电场风速特性,通过选择适当风力发电机组可以比较准确地预测风电场输出电能

    According to this distribution law of the wind speed in the farm, the power energy production of the wind farm per year can be forecasted accurately by choosing right wind turbine generators.

    youdao

  • 风力发电依赖于气象条件逐渐以大型风电场形式并入电网,给电网带来各种影响。

    Wind power generation is always weather dependent and has the trend of being integrated to power systems as the form of large-scale wind farms, which influences on power systems.

    youdao

  • 指出风力发电常规能源发电区别以及风电场并网电网带来的主要问题。

    It points out the differences between wind turbine generation and conventional energy generation, as well as the problems brought with wind field incorporated into power system.

    youdao

  • 简要介绍了风力发电现状指出了确定风电场穿透功率极限重要性

    The actuality of wind power generation is introduced in brief. Then the importance of wind power penetration limit is pointed out.

    youdao

  • 对于中国寻求能源生产传输业务,包括获得风电场风力发电站,怀有兴趣

    The Company is interested in pursuing and developing opportunities in electrical energy production and transmission in China, including acquiring wind farms and wind parks.

    youdao

  • 至少美国没有阻止沈阳电力集团美国得克萨斯州风电场提供中国制造风力发电

    At least the US didn't block the Shenyang Power Group from supplying Chinese-made wind turbines to a Texas wind farm.

    youdao

  • 建立基于桨距风力发电系统海上风电场直流并网仿真模型,并风电场几种典型运行情况的并网性能进行了仿真分析。

    The simulation model for the grid connection of offshore wind farm via VSC-HVDC based on the fixed pitch constant speed wind power generation system is established.

    youdao

  • 建立基于桨距风力发电系统海上风电场直流并网仿真模型,并风电场几种典型运行情况的并网性能进行了仿真分析。

    The simulation model for the grid connection of offshore wind farm via VSC-HVDC based on the fixed pitch constant speed wind power generation system is established.