给出了使用该系统实现装配顺序规划的实例。
An example of assembly sequence planning is presented via the modelings...
计算机辅助装配顺序规划是有关产品装配研究的重要内容。
The computer aided planning of assembling sequence is the important content concerning with the the study of production's assembly.
因此,研究计算机辅助装配顺序规划及其关键技术显得尤为重要。
So the study of assembly sequences planning is very important.
研究装配实例表示与重用技术,提出一种基于实例的装配顺序规划方法。
The paper studied the representation and reuse of assembly knowledge, and presented a case-based assembly sequence planning method in assembly planning for aircraft components.
本文原型系统通过减速箱装配体加以验证,表明了装配信息建模、装配顺序规划及其评价的可行性和有效性。
Prototype system verified by the reducer, indicates the feasibility and validity of assembly information building, assembly sequence planning and evaluation.
规划一个项目就是要设计出正确的工作顺序。
Planning a project is just a matter of working out the right order to do things in.
所有的用户应该评审这个顺序,并将任务拖拉到执行任务时实际规划的顺序上(如有需要以后可以随时排序)。
All users should review this ordering and drag the tasks into the order in which they actually plan to perform the work (it can always be rearranged later as needed).
读取和解释工程图纸,蓝图,图表和表格或研究样本零件,以确定要执行的操作加工,并规划最佳的操作顺序。
Read and interpret engineering drawings, blueprints, charts and tables or study sample parts to determine machining operation to be performed, and plan best sequence of operations.
项目管理办公室将注意力集中在与母体组织或顾客整体经营目标紧密联系的项目和子项目的统一规划、优先顺序、轻重缓急和执行方面。
The PMO focuses on the coordinated planning, prioritization and execution of projects and subprojects that are tied to the parent organization's or client's overall business objectives.
用于创建流程图、顺序图、信息跟踪图、流程规划图和结构预测图。包含连接线和链接。
Use for flowcharts, top-down diagrams, information tracking diagrams, process planning diagrams, and structure prediction diagrams. Contains connectors and links.
创建流程图、顺序图、信息跟踪图、流程规划图和结构预测图。包含连接线和链接。
Create flowcharts, top-down diagrams, information tracking diagrams, process planning diagrams, and structure prediction diagrams. Contains connectors and links.
规划制作,组装,安装及其他加工操作的工作顺序,以便指导生产人员开展工作。
Plans sequence of fabrication, assembly, installation and other manufacturing operations for guidance of production workers.
分层规划是指分别在部件层、组件层和零件层上进行装配顺序推理。
The layer upon layer indicates that the assembly sequence planning is carried out on components layer, subassembly layer and part layer respectively.
顺序任务分解算法(otd)是层次任务网规划(HTN)中的一种高效求解算法。
Ordered task decomposition (OTD) algorithm is an efficient algorithm for hierarchical task network (HTN) planning.
装配顺序生成是装配工艺与规划的重要研究课题之一。
The assembly sequences generation in the field of assembly planning is a important subject.
先按优先顺序法压缩各时段机组组合状态,再用动态规划法进行计算。
Optimal unit commitment is determined by dynamic programming on the basis of using priority list to limit the combination states.
它以空间顺序为研究对象,以计算机为工具,通过人的参与进行一系列的空间操作与分析,并提供规划管理和决策等有用信息。
It uses computer to proceed a series of operation and analysis in space, and provides the useful information of programming management and policy.
文章按照实际生产阶段顺序,将内容分为装配序列规划、装配工艺设计和装配过程仿真三部分。
The paper is divided into three parts according to the actual manufacturing sequence, the assembly sequences planning, the assembly process planning and the production simulation.
水平及牵引机器人;虚拟装配规划; 装配顺序; 装配路径;
Horizontal well traction robot; Virtual assembly planning; Assembly sequence; Assembly path;
其次,利用加强顺序约束和遮挡约束的双向动态规划方法来处理遮挡;
Secondly, a bidirectional dynamic programming method enforcing ordering and occlusion constraints was used to handle occlusions;
提出了一个保证公差要求的装夹方案和特征加工顺序自动规划方法。
A novel approach to automatic setup planning and operation sequencing, on the basis of tolerance requirements of the part, is proposed.
研究了产品公差信息对装配顺序、装配路径规划的影响,并改进了产品装配顺序生成与产品零部件的装配路径生成算法。
Research the effects of tolerance to the assembly sequence and path planning; improve the assembly sequence and path generating algorithms.
运用故事规划表、顺序表、检查表。
如果在执行计划顺序(比如,习惯)时,你规划好一个预计连续时间表,从一个任务到另一个任务转换,你就会动用比较少的心理能量。
If you block out scheduled uninterrupted times when you execute planned sequences (i. e. habits) you will use less mental energy trying to switch from task to task.
通过交替选配、潮流计算及各新增支路综合有效度的计算,确定出各规划水平年间新增电力设施的投建顺序的优化方法。
It calculates, by means of the alternative location-allocation method, the load flow and comprehensive effectiveness for each new line to decide the installation sequence of new equipment.
中小学在战略规划制定中遵循以上逻辑顺序进行谋划,能使学校规划更加科学、有效。
Following the logical order of strategic planning of primary and secondary schools can make planning more scientific and effective.
用于创建流程图、顺序图、信息跟踪图、流程规划图和结构预测图。
Create flowcharts, top-down diagrams, information tracking diagrams, process planning diagrams, and structure prediction diagrams.
用于创建流程图、顺序图、信息跟踪图、流程规划图和结构预测图。
Create flowcharts, top-down diagrams, information tracking diagrams, process planning diagrams, and structure prediction diagrams.
应用推荐