提案团队的标准做法是,创建一份项目风险评估,为高风险领域提供风险迁移策略。
It is standard practice for the proposal team to create a risk assessment of the project and provide risk mitigation strategies for high-risk areas.
考虑到工程项目建设的模糊性和随机性,本文提出一种用于工程项目风险评估的模糊概率分析方法。
Taking into account vagueness and randomness of project, fuzzy and probabilistic method for project risk evaluation is presented in this paper.
针对咨询公司ERP咨询项目风险的特点和风险定量评估要求,提出了基于贝叶斯网络的ERP咨询项目风险评估方法。
A risk evaluation method based on Bayesian network is proposed to quantitatively evaluate ERP consultation project risk of consulting firm.
然而,项目风险的迭代评估似乎没有在少数公开的再造工程过程中得到明确地处理。
However, the iterative assessment of the risks of the project does not seem to be explicitly dealt with in the few published reengineering processes.
维护一个客观的对项目风险以及进展的评估。
Maintain an objective assessment of the project's risks and progress to date.
当前,风险投资项目风险的定量化分析是一个重要的研究方向,各国风险投资机构并未采用统一的评估方法。
Currently, the ration analysis on venture investment program is an important research aspect, but the organizations in every country have not adopted a uniform evaluating method.
风险评估是项目风险管理的基础,是确保ERP项目成功实施的关键。
Risk evaluation is the basis of project risk management, and it's the sticking point of the successful ERP project implementation.
其次,对建筑工程项目风险管理的主要过程:风险识别、风险分析与评估、风险控制与决策分别进行了阐述。
Secondly, it is discussed respectively the main process of structural engineering project risk management-risk identification, risk analysis and assessment, risk control and decision.
本文主要对项目风险的评估方法进行研究,围绕风险评估中未确知信息(专家意见)对评估结果带来的不确定性展开工作。
This thesis studies on the assessment method for project risk, and mainly works around the uncertainties of assessment result aroused by the unascertained information in the risk assessment process.
基于风险评估结果,系统地研究广旺公路建设项目风险应对策略,并建立相应的风险控制体系,从而为项目建设中有效规避和控制风险提供直接指导。
Acoording to the result of risk evaluation, the risk control strategies and system are researched and supposed for Guangwang Road Project, which can effectively help to reduce and avoid risk loss.
本文介绍了上海轨道交通8号线车辆项目管理的背景以及项目风险目标和评估范围。
This article presents the background of vehicle project management for Line 8, Shanghai Rail Tranist, project risk target and scope of evaluation.
通过对项目风险的分析阐述,对可能造成的各种影响和影响程度进行定量的分析和评估。
This text analyzes and assesses quantitatively various kinds of potential influence through an analysis of project risk.
项目工程工期风险评估是项目风险控制与科学管理中的基础环节。
The risk assessment ACTS as a foundation link in the control and management of engineering project.
在风险分析和评估部分,从信息论的角度重新定义项目风险,根据项目风险因素提供的信息量的多寡判定风险大小。
In the risk analysis and evaluation part, this paper defines the project risk in the point of view of the information theory, judges the risk by the information quantity provided by the risk factor.
在此基础上,运用模糊综合评判法,利用数学模型对风险进行量化评估,从而对船舶保函授信项目风险进行风险的综合评价;
On the basis of this analysis, this essay employs mathematics model to make quantitative evaluation of risks so as to give overall risk appraisal for ship-building guarantee;
评估项目风险并决定项目是遵循VBPD流程或合并部分VBPD过程。
Access the project risk and decide to apply VBPD or combined VBPD process.
评估项目风险并决定项目是遵循VBPD流程或合并部分VBPD过程。
Access the project risk and decide to apply VBPD or combined VBPD process.
应用推荐