给测试项目设置一个这样的目录结构。
部署这种体系结构不需要更改项目设置。
To deploy to this architecture, no project Settings need to be changed.
上下文变量方法在项目设置中易于使用。
The context variable approach is easy to use in the project setting.
选择默认的项目设置,并单击Finish。
将后续菜单栏项目设置为右对齐。
Right-justifies the menu item and any subsequent items in a menu bar.
建筑项目设置数据库为只读?
在你的项目设置中可以设置输入的参数。
这是相关的项目设置吗?
打开项目设置(控制- D或通过“编辑”菜单)。
在我们的示例中,我在项目设置中包括以下报告定义。
In our example, I include the following report definitions in the project setup.
想象一下,仅仅是给项目设置正确的类路径就会非常困难。
Imagine how hard it could be just to set up a project with the right classpath.
为SupplyChainWeb项目设置所有的依赖关系。
线性化工作空间-AfterEffects项目设置。
为项目设置derby . system . home。
设法坚持您为您的厨房重新擦亮项目设置了的预算。
Try to stick to the budget you have set for your kitchen refurbishment project.
为了得到最好的景观,项目设置在可允许范围内的最高处。
To get the best possible view, the project was placed at the highest point of the land, but also the most confined by the site limits.
为项目设置唯一的自定义别名,(例如:WPF—VSTactics)。
Setting up a custom alias for this project only (e.g. "WPF - VS Tactics", etc.)
在后遗症的最重要的设置,需要调整的是“工作空间”,在您的项目设置线性化。
The most important setting in AfterEffects that needs to be adjusted is "Linearize Working space" in your project Settings.
能够绑定到选择的开发、测试、生产或任何其他数据库,无需更改开发项目设置。
Ability to bind to development, test, production or any other database of choice, without changing your development project Settings.
第一次运行转换,确保将当前工作区中的一个Eclipse项目设置为转换的目标。
The first time you run the transformation, be sure to set any Eclipse project in the current workspace as the target of the transformation.
财务助手:资金帐户、收支项目设置、每日项目收支登记、收支明细报表。
Financial assistant: fund account, income and expenditure items, daily project budget and expenditure, income and expenditure detail report.
CSS呈现形式能使你在一行而不是一个分开的行中为每个列表项目设置列表。
CSS presentation styles allow us to set the list to run on one line instead of a separate line for each list item.
以下部分包含了一些建议,从项目设置到测试,这些在创建自己的AST转换时可能会很有用。
The following sections contain recommendations, from project setup to testing, that you may find useful when creating your own AST transformations.
您可以向项目添加执行同步化的用户,或者编辑项目设置,这样所有的用户都拥有该许可权了。
You can either add the user who will be executing the synchronization to the project or modify the project Settings so that all users have this permission.
该项目设置了很多深海浮标,其中的39个为美国所有,其他10个为其他国家所有。
there are 39 U. S. -owned ones and there are 10 that are owned by other countries. The buoy has nothing to do with the measurement;
表1描述project . properties中被设置为支持这种项目设置的那些属性。
Table 1 describes some of the properties in project.properties that have been set to support this kind of project setup.
如果您是第一次运行转换,务必把包含您的模型的Eclipse项目设置为转换的目标。
The first time you run the transform, be sure to set the Eclipse project containing your models as the target of the transform.
针对目前普通高校校运会项目设置、竞赛形式、组织管理等方面所存在的问题进行了分析。
This article analyses some problems of ordinary university sports meeting at present, for example, project establishment, competition form and organization management, etc.
数据更改是否符合冲突的条件取决于为项目设置的冲突跟踪类型:行级、列级或逻辑记录级。
Whether or not a data change qualifies as a conflict depends on the type of conflict tracking you set for an article: row-level, column-level, or logical record-level.
数据更改是否符合冲突的条件取决于为项目设置的冲突跟踪类型:行级、列级或逻辑记录级。
Whether or not a data change qualifies as a conflict depends on the type of conflict tracking you set for an article: row-level, column-level, or logical record-level.
应用推荐