项目经理部的成本管理是整个建筑施工过程成本管理的重要一环。
The cost management of project management department is an important part in that of the whole process of construction engineering.
负责组织项目经理部的分部工程、单位工程的自验,负责向公司工程部提出预验收申请。
Responsible for the organization of enterprise project engineering, unit engineering division of the check, put forward to the company responsible for the engineering pre-acceptance application.
本文介绍项目经理部在开展安全检查过程中的常见通病,分析其成因并提出相应防治措施。
This article presents some of the common errors of the project management in conducting safety checks, analyses the reasons that cause such errors and then put forwards some preventive treatments.
定期主持召开项目经理部生产例会,定期组织并主持项目分包商及发包人指定分包商的项目协调会;
Preside routine production meeting periodically; organize and preside project coordinating meeting for subcontractors and Client?s nominated subcontractors.
公司下设有一室四部的平面管理体系,即综合办公室、财务部、经营部、工程部及各项目经理部等。
The company has been under one room four books management system, namely the planar integrated office, the ministry of finance, the various project, engineering and joint etc.
在介绍房地产项目团队建设中主要提出了项目经理部的高效性和学习能力对于整个项目管理的重要性。
By introducing the team construction of real estate project, we mainly put forward that project manager's high efficiency and study ability is very important for the whole project management.
工程项目经理部的全部管理行为的本质,是运用项目管理原理和各种方法来降低成本,创造经济效益。
The nature of all the management ACTS of the project management department is to use the theory of project management and methodology to cut cost and generate economic benefits.
项目经理部作为企业的成本中心,必须作好成本控制工作,降低施工成本,为企业创造最大的经济效益。
As the center of the enterprise's costs, management department must successfully control the costs, reduce the costs of the construction, and create the maximal economic benefits of the enterprise.
项目经理部作为企业的成本中心,必须作好成本控制工作,降低施工成本,为企业创造最大的经济效益。
As the center of the enterprise's costs, management department must successfully control the costs, reduce the costs of the construction, and create the maximal economic benefits of the enterprise.
应用推荐