• 项目进展情况项目可报告已经计委批复

    PROJECT PROGRESS:Planning Committee Gansu Province has approved the feasibility study report.

    youdao

  • 介绍该项目概况做好中外合资项目可研工作几点粗浅体会。

    The general content of such feasibility report and several simple understandings about how to finish feasibility report of joint venture project are introduced in the article.

    youdao

  • 项目前期工作进展情况完成,2012年已立项,列入2013年福建省重点建设项目

    V. Preliminary work: the feasibility study has been finished; the Project has passed the review since 2012 and been listed in 2013 key construction projects of Fujian Province.

    youdao

  • 中科合成油贵州规划了煤项目,目前已经完成了预

    Synfuels China also planned a huge CTL plant in Guizhou Province and prepared a pre-feasibility study on the project.

    youdao

  • 目前正在进行项目前期筹备工作厂址规划已经完成,正在编制可研方案及设备选型。

    The preparing working in earlier stage of project is under way currently. The plant location programming has accomplished.

    youdao

  • 建议项目国家带来的优势巨大保证一系列可研延误进行

    The proposed project advantages to the country are immense and may warrant a series of pre-feasibility studies to be conducted without delay.

    youdao

  • 项目准备进展情况规划已经完成

    Project Progress: feasibility report and its plan have been finished.

    youdao

  • 似乎没有谓语嘛,“钢构基坑结合可研项目建议书施工”,见笑了!

    As for steel pillar and foundation frying the dint to connect design of study with the suggestion.

    youdao

  • 似乎没有谓语嘛,“钢构基坑结合可研项目建议书施工”,见笑了!

    As for steel pillar and foundation frying the dint to connect design of study with the suggestion.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定