• 施工时应加强材料检验隐蔽工程检查,确保施工质量

    The particular checks to the materials and construction are necessary for the quality of the construction.

    youdao

  • 第二百七十八隐蔽工程隐蔽以前承包人应当通知发包人检查

    In the case of concealed work, the contractor shall give the developer notice for inspection prior to concealment.

    youdao

  • 长期以来我国隐蔽工程质量检测评价方法仍沿用着传统开挖检查钻孔取样试验常规技术。

    It has been long time that the examination and evaluation of the concealed engineering works are made via some conventional methods, such as excavation and drill sampling.

    youdao

  • 隐蔽工程那些施工完毕后一道工序的继续施工所遮盖无法难以再对它进行检查的那些分部、分项工程

    The concealed work refers to those divisional and partial constructions which will be covered by the next procedure soon after they are completed and are unable or difficult to be re-examined.

    youdao

  • 隐蔽工程那些施工完毕后一道工序的继续施工所遮盖无法难以再对它进行检查的那些分部、分项工程

    The concealed work refers to those divisional and partial constructions which will be covered by the next procedure soon after they are completed and are unable or difficult to be re-examined.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定