代办冲刺中的项目通过小时来评价,这样团队才能明白该项目是否能够按时完成。
The items in the Sprint Backlog are estimated in hours so that the team can determine whether the items can be completed in time.
方法通过资料收集、现场调查、监测、统计分析、有关法规标准对照等手段,全面客观对该项目的职业病危害控制效果做出评价。
Methods The assessment was conducted objectively and completely by material collecting, workplace investigation, monitoring, statistic analysis and related law or standards comparison.
最后,根据评价的结果判断该项目风险的风险分布状况,并通过研究得出提出了相应的防范对策。
Finally, based on results of the evaluation to determine the risk of the distribution of project risks, and emerging from the study made by the corresponding preventive measures.
最后,根据评价的结果判断该项目风险的风险分布状况,并通过研究得出提出了相应的防范对策。
Finally, based on results of the evaluation to determine the risk of the distribution of project risks, and emerging from the study made by the corresponding preventive measures.
应用推荐