对多种连接形式的连接梁进行了振动传递特性的试验研究。
The vibration transmission properties of joint beams were investigated by measurement.
本发明中的连接梁可单独打开,传动滚筒能从上方单独取出,可方便地检修和更换传动滚筒。
The inventive connecting beam can be opened, and the transmission roller can be taken out from it, therefore, the transmission roller can be maintained easily.
再然后,进入房屋全面设计,例如柱、梁、房屋框架和各类连接,以及使用多少钢筋?
And then you get into all kinds of things in terms of the designs of the columns and the beams and the framing of the building and the connections. And how much steel do you put in?
发动机驱动着机器人的尾巴和连接它上身那弯曲的像梁一样的固定装置。
The motor that drives the robot's tail and a curved, girder-like stabilizer bar attach to the robot's upper body.
块状物,斜钉,专有的紧固件在墙梁-柱子连接中被用到,这比公寓建设需要更多的材料和劳动力。
Blocking, toe-nailing, or proprietary fasteners are needed for the girt-to-post connection, which requires more material and labor than flat construction.
竹框架与基座和混凝土梁通过金属管道和铁钉连接,使得结构更加稳定。
Bamboo frame connected with the foundation and concrete beams with metal pipes, iron pins makes the structure stable.
钢结构节点设计中,梁与柱弱轴方向的柔性连接常采用剪力板高强螺栓连接,螺栓群所承受的荷载有竖向力和偏心力矩。
In the connection design of steel structure, the shear plate with high-strength bolt connection is extensively used at the flexible joint where the beam is connected to the weak axis of the column.
最后给出了牛腿的配筋形式以及牛腿和梁之间的连接构造。
Finally the reinforcement forms of the bracket and the connecting construction between the bracket and the beam are proposed.
该仪器索赔16 ,进一步组成的第三次和第四次交叉梁连接平行的第一届和第二届跨梁,分别。
The apparatus of claim 16, further comprising third and fourth cross beams connected parallel to the first and second cross beams, respectively.
连接大梁和三角孔桁梁顶点的支柱。
在悬索桥的纵梁和横的连接处,纵梁的腹板上发生开裂。
Stringer webs have cracked in suspension Bridges at the stringer - floor bean connections.
在悬索桥的纵梁和横的连接处,纵梁的腹板上发生开裂。
Stringer webs have cracked in suspension Bridges at the stringer-floor bean connections.
为了保证稳定性,由铸铁构件和厚板梁组成的原有楼层均被由一种新的结构来取代,这种新的结构由新型连接构件和现浇混凝土楼板组成。
So as to maintain stability, the existing floors composed of cast-iron posts and slab beams were methodically replaced by a new structure composed of mushroom posts and concrete floors poured on site.
钢-混凝土组合梁是指钢梁和混凝土板通过剪力连接件连接形成整体共同工作的受弯构件。
Steel-concrete composite beam is a kind of flexural member composed by concrete slab and steel beam via shear connectors.
黑色的螺旋楼梯围绕着暴露出来的梁直接连接到屋顶结构,联系起了所有的三层区域。
A black spiral staircase clips onto exposed timber beams in the roof structure to connect all three floors.
实测资料表明,上下行并行的钢板梁桥在采用“两桥连接”加固以后,平联杆件的弯曲变形和断裂现象急剧增多。
Measured results indicate that the bend deformation and abruption phenomenon appears very quickly when the "two-bridge-junction" method is adopted in the parallel steel plate beam.
传统的钢框架分析和设计都假定梁与柱的连接是完全刚性的,或是按理想铰接的。
The traditional analysis and design of steel frame assume beam-column connections are fully rigid or ideal pin connection.
且在其中通过设计变量连接来满足薄壁梁的稳定性要求。
The stability of the thin plate is regarded by design variable link.
某钢厂列吊车梁在工作中,由于吊车工作的动态作用,导致制动梁(连接板)经常发生断裂,固定连接板的螺栓松动。
The brake beam(connecting plate) is often broken, and the bolts for fixing the connecting plate are loosed due to the crane′s dynamic load when D series of crane beams are working in a steel plant.
同时,对拱脚和系梁连接节点处进行了结构优化,解决了拱脚处受力复杂的问题。
Meanwhile, the connecting nodes of the arch foot and the tie bar are structurally optimized to solve the problem of complicated forces on the arch foot.
在门架严重扭曲时的主梁、支腿、下横梁、台车及他们之间的连接件均会承受很大的扭曲应力。
When the door frame is seriously distorted, the main beam, the supporting legs, the lower beam, the trolley and the connecting piece of the frame can bear large distortion stress.
外置式锚头多用于悬索桥,具有造型美观,不削弱被连接的拱、梁结构,施工安装方便等优点。
Out-laid anchor heads are used for suspension Bridges mostly because they have the advantages such as attractive in appearance, not weakening arch and girder structure connected, and easy to install.
花园的混凝土墙从娱乐室延伸至连接坡道的花园,形成部分悬臂梁并呼应了主要空间的混凝土墙。
A garden concrete wall stretches out from the media room toward the garden adjacent to a rear ramp and forms part of the cantilevered bench that echoes the concrete wall material in the main space.
剪力连接的非线性将导致钢与混凝土组合梁挠度的显著增加。
Shear connection nonlinearity always results in a significant increase in deflection of steel-concrete composite beams.
部分剪力连接对组合梁的受弯极限承载力和变形均有影响。
Shear connection degree has an effect on the flexural capacity and deflection of composite beams.
通过试验结果与理论、规范比较,考察了不同荷载水平作用下半刚性连接对组合梁性能的影响。
The effect of semi-rigid connections on the performance of composite beams with various loadings was compared with predictions and codes.
另外,作者对组合梁剪力连接件的设计理论及组合梁最大裂缝宽度计算方法作了逐一地探讨。
In addition, the calculating methods about the gap of the connectors and the maximum width of crack are discussed in the thesis.
秦皇岛体育场屋盖由24榀悬臂桁架组成,桁架之间以弧形拱梁和钢索连接为空间稳定体系。
Qinhuangdao stadium roof system is composed of 24 cantilever trusses. The truss, arc beams and cables form together a steady space system.
研究了加肋腹板连续组合梁的横向连接刚度和强度。
The strength and stiffness of continuous composite beams with stiffened web are investigated.
研究了加肋腹板连续组合梁的横向连接刚度和强度。
The strength and stiffness of continuous composite beams with stiffened web are investigated.
应用推荐