• 大型基础工程地下隧道高架跨江桥水利枢纽构筑物,它们的使用期长达几十年甚至上百年,对它们进行健康监测的概念很早就提出了

    Many large scale projects such as tunnels, viaducts, river bridges, riverbanks and irrigation works hinge et al. , there use time are as long as several decades or even centuries.

    youdao

  • 随着跨江铁路建设,车和耦合振动引起接触网振动进而影响弓网的耦合振动。

    Along with the construction of large-span, river-crossing Bridges, vehicle-bridge coupling vibration will make catenary vibrate, which can further affect pantograph-catenary coupling vibration.

    youdao

  • 柳州三门双塔、双索面、三部分斜拉预应力混凝土箱梁

    The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.

    youdao

  • 柳州三门双塔、双索面、三部分斜拉预应力混凝土箱梁

    The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定