• 对于复杂工程施工系统工期一定、资源均衡资源进度计划需要解决的一个重要且有相当难度问题

    For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.

    youdao

  • 项目经理建立第一个迭代的项目计划安排方法集成项目资源定期所有涉众报告进度

    The project manager creates a first iteration project plan and arranges the resources for the methodology integration project, reporting on progress regularly to all stakeholders.

    youdao

  • 创建计划文档一个ODC计划应该包括记录资源分配工作进度以及评估步骤

    Create planning documents: an ODC plan should include recording the allocation of resources, working effort, and assessment steps.

    youdao

  • 一方面,项目管理者更加关注资源进度成本等方面管理项目计划

    The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.

    youdao

  • 然而归根结底就是计划进度管理资源资金小组

    However, it all comes down to managing a funded group of resources to a plan and schedule.

    youdao

  • 工作说明资源列表一旦创建完成项目经理就应该制定项目进度计划通常以下几步。

    Once the statement of work and the resource list have been created, the project manager should build a project schedule. This is usually done in several steps.

    youdao

  • 编制进度计划——分析工序顺序、工序持续时间资源需求

    Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.

    youdao

  • 一个项目计划一般包含任务关联资源进度预算假设等等

    A project plan consists of tasks, dependencies, resources, schedules, budgets, and assumptions.

    youdao

  • 讨论项目进度计划冲突资源相关关键任务、关键任务以及关键任务提出统一定量表示方法

    This paper discussed the critical task, critical task set and critical task group involved conflict resource in a project scheduling scheme, and put forward a unified quantitative express method.

    youdao

  • 因为很多进度计划制定时没有相应资源预测支持,而且制定计划方法很多,所以核实基准计划这个步骤可以说是见仁见智的。

    Since many construction programmes are not resourced, and there may be a variety of ways of programming the project, this verification exercise may well be highly subjective.

    youdao

  • 施工进度计划各项资源计划技术应用

    The project schedule, Each resource planning, The new technology application;

    youdao

  • 动态管理模型能够本着节约的原则编制资源供应计划进行资源使用效果分析配合进度计划改变资源投入

    The dynamic management model can workout resource providing plan by saving fundamental, and analyse there effect , assort the plan to change devotion.

    youdao

  • 分配资源确定项任务所需时间制定项目进度计划

    A project schedule is created by assigning resources and determining the calendar time required for each task.

    youdao

  • 这个简化示例中我们一个包括10活动进度计划。各项活动资源平衡,保证资源优化利用

    In this overly simplified example, we have a schedule with 10 activities that have been leveled to ensure optimal use of assigned resources.

    youdao

  • 施工进度计划根据公司劳动力资源SECCO对施工进度要求计划进行编制,附录

    Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.

    youdao

  • 同时结合企业另一案例资源平衡优化项目进度计划保证项目最终完成并做出评价

    Meanwhile, combined with another example of XX Company, the evaluation of the adjustment has been done with resource balance method to optimize the accomplishment of projects.

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定