对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。
For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
项目经理建立第一个迭代的项目计划并安排方法集成项目的资源,定期向所有涉众报告进度。
The project manager creates a first iteration project plan and arranges the resources for the methodology integration project, reporting on progress regularly to all stakeholders.
创建计划文档:一个ODC计划应该包括记录资源分配,工作进度以及评估步骤。
Create planning documents: an ODC plan should include recording the allocation of resources, working effort, and assessment steps.
另一方面,项目管理者更加关注从资源、进度和成本等方面管理项目计划。
The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.
然而,归根结底就是为计划和进度表管理资源的资金小组。
However, it all comes down to managing a funded group of resources to a plan and schedule.
工作说明和资源列表一旦创建完成,项目经理就应该制定项目进度计划。通常分以下几步。
Once the statement of work and the resource list have been created, the project manager should build a project schedule. This is usually done in several steps.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
一个项目计划一般包含任务、关联、资源、进度、预算和假设等等。
A project plan consists of tasks, dependencies, resources, schedules, budgets, and assumptions.
讨论了项目进度计划中与冲突资源相关的关键任务、关键任务组以及关键任务群,提出了统一的定量表示方法。
This paper discussed the critical task, critical task set and critical task group involved conflict resource in a project scheduling scheme, and put forward a unified quantitative express method.
因为很多进度计划在制定时没有相应的资源预测支持,而且制定计划的方法很多,所以核实基准计划这个步骤可以说是见仁见智的。
Since many construction programmes are not resourced, and there may be a variety of ways of programming the project, this verification exercise may well be highly subjective.
施工进度计划;各项资源计划;新技术应用;
The project schedule, Each resource planning, The new technology application;
动态管理模型能够本着节约的原则编制资源供应计划,并进行资源使用效果分析,配合进度计划改变资源投入。
The dynamic management model can workout resource providing plan by saving fundamental, and analyse there effect , assort the plan to change devotion.
分配资源,确定每项任务所需的时间,制定项目进度计划。
A project schedule is created by assigning resources and determining the calendar time required for each task.
在这个简化的示例中,我们有一个包括10项活动的进度计划。各项活动都经资源平衡,以保证对资源的优化利用。
In this overly simplified example, we have a schedule with 10 activities that have been leveled to ensure optimal use of assigned resources.
施工进度计划根据公司劳动力和资源及SECCO对施工进度要求的计划进行编制,见附录。
Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.
同时,结合某企业另一案例,用资源平衡法优化项目进度计划保证项目的最终完成并做出评价。
Meanwhile, combined with another example of XX Company, the evaluation of the adjustment has been done with resource balance method to optimize the accomplishment of projects.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;