他吃惊地发现至少有$10亿的费用超支。
He was stunned to discover cost overspends of at least $1 billion.
那要归咎于费用超支和生产延误。
该计划一直被费用超支和拖延困扰。
由于费用超支和国家经济崩溃,修公路的计划破灭了。
The plan to build the highway went bust because of cost overruns and the country's economic collapse.
印度船运公司称,他们每月都因为海盗导致的费用超支以及误期而损失45万美金。
Indian shipping firms say they are losing $450, 000 a month on cost overruns and delays due to piracy.
财务数据库,包括如工时、发生的费用、预算以及任何项目费用超支等信息。
Financial database containing information such as labor hours, incurred costs, budgets, and any project cost overruns.
这项工程首次启用时间定于2011年,自那以后工程便一直延迟,而且工程费用超支约20亿欧元。
But the project has been plagued by delays since its first scheduled opening in 2011 and roughly two billion euros in cost overruns.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
我们应该制止纳税人设法资助费用总是大大超支的联合武器开发的这种胡闹。
We should stop the nonsense of taxpayers trying to finance joint weapons whose costs always overrun hugely.
这里的重复是类似的:“电费缴纳人,纳税人及股东所要支付的总费用来自成本超支,取消的核电站,及那些以今天的美元算的话超过3千万的搁置成本。”
The refrain here is familiar: “The total cost to ratepayers, taxpayers and shareholders stemming from cost overruns, canceled plants and stranded costs exceeded $300 billion in today's dollars.”
起初,我认为我们低估了项目的费用,因为在大部分时间都很拮据,但是我们设法去避免超支。
Initially, I thought we'd underestimated the cost of the project, as it was so tight most of the time, but we managed to avoid an overspend.
工程的粗制滥造导致了维护费用的超支。
在收回此类损失和超支费用后,雇主应向承包商支付任何结存金额。
After recovering any such losses, damages and extra costs, the Employer shall pay any balance to the Contractor.
本文的模型用于预测工程设计费用潜在超支的大小。
This paper describes a model for use in predicting cost overruns on engineering design projects.
这些费用会影响到我们的利润,使我们预算超支。
Those costs will impact our profitability, to make our budget overrun.
确保你可以以书面批准前,这些费用支出超支。
Make sure you can approve overruns in writing before those costs are incurred.
确保你可以以书面批准前,这些费用支出超支。
Make sure you can approve overruns in writing before those costs are incurred.
应用推荐