从而,我们能够少做许多计划工作。
计划工作要容易得多,为自己计划大量的工作。
认识到计划工作是一个持续的过程。
可以使用在线计划工作表(OLPW)制定计划。
The online planning worksheets (OLPW) can be used for the planning purpose.
谁做的这个项目的预算计划工作? ?
A:谁做的这个项目的预算计划工作?
未计划工作的识别与执行,包括范围变更。
Unplanned work identified and implemented, including scope changes.
我们需要计划工作过程。
已计划工作的执行与测试,实际的与期望的
计划工作。
生产运作日常计划工作,如焊接及装配计划。
Daily planned for manufacturing work centers. Planning for Weld Cells. Planning for Assembly.
被用来执行此分级的量度被定义为动员和计划工作的一部分。
The metrics needed to carry out this ranking are defined and agreed as part of the mobilization and planning effort.
我们主要的计划工作项目包括费用预算和施工进度。
Our major planning items contain estimating of cost and construction schedule.
儿子布林克拥有工商管理硕士学位,在俄勒冈州做工业计划工作。
Our son, Brink, has an M.B.A. degree and is an industrial planner in Oregon.
敏捷中的计划工作,是一系列连续的步骤,没有明确的界限划分。
Sequential Planning to Agile is a continuum of steps not flipping a switch.
正在强化将于5月下半月开展的下一次全国性免疫运动的计划工作。
Planning for the next nationwide immunization campaign to be conducted in the second half of May is being intensified.
一旦单独的项目被集成起来,就该到开始制定规划计划工作的时候了。
Once the individual project plans are integrated, it is time to initiate the program planning effort.
解释计划工作如何包含今天的决策和它怎样影响未来的决策。
Explain how planning involves making decisions today that will have an impact later.
租约公司的例子从哪些方面说明了动态环境中有效的计划工作?
How does Lend Lease illustrate effective planning in a dynamic environment?
生产能力计划工作所要反映的是公司能够生产和销售的产品数量。
Capacity planning is to be reflected in the number of companies to produce and sell products.
究其原因,主要是计划工作的不充分和纺纱工艺设计的不太合理。
The reasons for this are in particular insufficient planning work and unsatisfactory spinning design.
没有团队精神,每个人按照他自己的计划工作,一点效率都没有。
Without team spirit, everyone works according to his own plan and there is no efficiency at all.
准备并给与会者发出会议通知,同时发出已完成的回顾计划工作表。
Prepare and issue the meeting notice to the participants, including the completed retrospective planning worksheet.
应分析更改请求以确定它对现有工作和计划工作产生的影响的范围。
A change request should be analyzed to determine the scope of its impact on existing and planned work.
应分析更改请求以确定它对现有工作和计划工作产生的影响的范围。
A change request should be analyzed to determine the scope of its impact on existing and planned work.
应用推荐