大岗山水电站坝肩边坡地质条件复杂,断层、岩脉、卸荷裂隙密集带、深部卸荷带及节理裂隙发育。
The abutment slope at Dagangshan Hydropower Project has complex geological conditions with faults, dikes, unloading crack intensive belt, deep unloading belt and developed joint fissures.
矿体受地层和构造联合控制,一般产在褶皱的层间剥离裂隙、构造裂隙及节理中,或产于褶皱翼部的断裂破碎带内。
Ore bodies are jointly controlled by both strata and structures, and usually they are distributed in folded layers' fissures, structural fissures and joints or in the broken belts of fold flanks.
借用节理裂隙的统计方法拟合局部化带,得到破坏通道;
With the rock fracture statistics technology, the failure passage can be fitted;
借用节理裂隙的统计方法拟合局部化带,得到破坏通道;
With the rock fracture statistics technology, the failure passage can be fitted;
应用推荐