这些数据包含节点类型、标题、摘要、主体、创建者和创建时间。
This data includes the node type, title, teaser, body, creator, and creation time.
随着节点、会话和用户数量的增加,每个节点花在维持备份拷贝上的工作量也会增加,从而只留下更少的时间去为用户请求服务。
As you increase the number of nodes, sessions, and users, each node spends an increasing amount of effort maintaining backup copies, leaving less time to service user requests.
如果是3个节点的话,相同事务类型测量到的时间依次为:13372、12185和1121。
For 3 nodes, the measured times were 13372, 12185 and 1121 for each of the transaction types.
在系统名称中选择节点名称和类型(大部分时间可以使用缺省值)。
Choose node name and type in the system name (most of The Times the defaults are fine).
在计算节点上通过代理收集数据会与用户的作业争夺内存和CPU时间。
Collecting data with agents on compute nodes can suck memory and CPU cycles from the user's jobs.
该节点的属性窗格显示在实际节点上花费的时间和总运行时间。
The properties pane of this node reveals the time spent in the actual node and the total elapsed time.
安装以负载平衡和故障转移为特色的更复杂的节点群会用去长得多的时间。
Installing a more complex collection of nodes featuring load-balancing and fail-over can take considerably longer.
检索作业和返回结果至少要耗费两个轮询周期,并且根据节点处理作业实际花费的时间,可能会耗费更多周期。
It takes at least two polling cycles to retrieve a job and then return results, and it could take additional cycles depending on how long the job actually takes to process on the node.
确保您和志愿者都了解需要完成的工作内容、时间节点
Work plan. Make sure both you and the volunteer understand the work to be done, the timeline and when you will next check in about progress.
DATE和TIMESTAMP:用于带有日期或时间戳值的节点。
Date and timestamp: For nodes with date or timestamp values.
节点包含许多用于应用和解析序列的选项,包括字面值、来自XPath谓词的表达式计算和特定时间长度内的序列。
The nodes have a wide range of options for applying and parsing sequences, including literal values, expressions calculated from an XPath predicate, and sequences bounded by a given length of time.
并在仿真测试中对该模型的性能进行了分析,证明该模型在收敛时间,节点查询速度,和对扰动的适应性方面优于传统的模型。
The simulation results of the model performance are analyzed to prove the convergence time, node querying speed and adaptability to churn are better than the traditional model.
一种方式可以是做一个时间表并在上面显示日期和项目从开始到结束的关键节点。
One way may be in a timeline chart showing dates and key benchmarks from the conception of the project to its completion.
阐述了IEC 61850对逻辑节点、通信信息片、事件时间、传输时间、报文的类型和性能级的定义。
The definitions given by IEC 61850 on logical nodes (LNs), PICOM, event time, transfer time, types and performance classes of message are expounded.
结果和分析显示该模型在这些指标上取得了一定的提高,比如命中率和响应时间,而没有占用更多节点的资源。
The results and analyses show that this model can improve certain capabilities, such as hit ratio and response time, without bringing negative influence.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
考虑传感器网络中节点非常稠密的特点,提出了一种将网格结构和密度控制相结合的路由算法以延长网络生存时间。
Considering the character of high density of nodes in sensor network, a new routing algorithm combines the structure of grid with density-controlling, is proposed.
该技术通过网络节点之间时间基准的相互交换和相互控制,实现节点之间的相互同步。
The synchronization of the network is achieved by the exchange and interaction control of the time benchmark between the nodes.
首先用等间距步长将距离和时间分为一系列的离 散节点。
Firstly, the distance and time are divided into a series of discrete nodes with evenly spaced increments.
包括伪随机信道序列、邻居表管理、时间同步、邻居发现以及节点发送和接收数据。
Pseudo-random channel sequence and time synchronization ensure that each node knows the work information of surrounding neighbors which are in the one hop range.
提出了一个基于节点知名度和活跃度的离散时间话题传播模型。
A discrete time dynamic model is proposed for bursty propagation of incidental events based on the node popularity and activeness in blog networks.
该算法利用连续两次同步过程中所记录的时间信息来估算节点时钟的偏移和频率漂移率,并进行补偿。
The clock offset and frequency drift rate for sensor nodes are estimated and then compensated by using the time-stamp recorded in two adjacent synchronizations.
先对流程节点的时间属性进行分析,主要包括时间约束和时间冲突。
First, it analyzes the time attribute of process node, there are mostly two parts: time constraint and time conflict.
协调团队成员有效的开展工作,保证项目按照时间节点和客户的要求完成;
Cooperate with core team member fully committed and motivated to deliver the project on time, to the customer's satisfaction.
维护系统数据以保证BOM的正确,运输时间,安全库存书评和时间节点。保证MRP的准确性。
Maintain system parameter and data to insure correct BOM, transit times, safety stock levels and scheduling points. Ensure MRP is accurate.
引入了交易时间和交易规模、交易次数等因素来进行信任值的计算,利用惩罚项来限制交易节点提供恶意服务。
Transaction time factors, transaction scales, and transactions number are introduced to calculate the trust value. Penalty item is used to limit node to provide malicious service.
同时完善了用户界面。针对默认各个计算节点均能完成任务的问题,本文通过监控各个节点所负担作业的运行进度和设定作业时间阈值来管理作业运行。
For the problem of acquiescing in each calculation node for completing tasks, we manage job allocation through monitoring operational progress at each node and setting time threshold value.
同时完善了用户界面。针对默认各个计算节点均能完成任务的问题,本文通过监控各个节点所负担作业的运行进度和设定作业时间阈值来管理作业运行。
For the problem of acquiescing in each calculation node for completing tasks, we manage job allocation through monitoring operational progress at each node and setting time threshold value.
应用推荐