网络计划方法是进度计划与控制的一种基本方法。
Network planing is a kind of basic method for degree of progress plan and control.
目前,工程项目进度计划的编制多采用网络计划方法。
Project network technique is presently a frequently-used method to make project schedule plan.
结果表明,用联系数进行网络计划与控制,比传统的网络计划方法提供了更多有价值的信息,具有更灵活的处理能力,是值得深入研究的问题。
The results illustrate that the new planning and control method based on the connection number are more flexible and can provide more useful information. It is valuable to further research.
巴黎——英国议会周四批准了一项计划,决定对数字媒体盗版进行打击,方法就是授权中断累犯们的网络连接。
PARIS - the British Parliament on Thursday approved plans to crack down on digital media piracy by authorizing the suspension of repeat offenders' Internet connections.
可以购买一些现成的课程计划、网络课程、软件或音像制品,也可以使用“非校园化的”方式,例如现实活动或将以上方法集中起来。
Buy ready-made plans, take online classes, check out software or video lessons, use an "unschooling" approach that teaches through real-life activities or incorporate a mix of all of these.
这些方法由网络框架在客户机完全从网络断开(计划好的断开)时调用。
These methods are called by the network framework when the client is completely disconnected from the network in a planned disconnection.
当网络感知组件检测到客户机突然离线,而不是计划中的断开时,就会调用disconnected方法。
The disconnected method is called when the network-aware component detects that the client has gone offline abruptly as opposed to a planned disconnection.
首次提出了融合列车编组计划和列车运行图的服务时空网络概念,为研究动态空车调配问题提供了一种有效的技术手段和建模方法。
This dissertation designs a service time-space network combined with train formation plan and train schedule for the first time, which makes for modeling dynamic empty car distribution.
一个正式的计划是至关重要的建立一致的,基于标准的方法,整个组织的网络安全和消除了个人主动唯一的依赖。
A formal program is essential for establishing a consistent, standards-based approach to cyber security throughout an organization and eliminates sole dependence on individual initiative.
网络计划技术是施工项目管理中行之有效的一种管理方法,在进度计划与管理中得到了广泛地推广与应用。
Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.
对模糊型网络计划,计算模糊工期风险概率是利用模糊事件概率的普通事件概率表示方法,用常规的概率方法求解。
Using the expression way of general event probability to fuzzy event probability, common method of probability can find fuzzy event period risk for fuzzy network planning.
以建筑环境与设备工程专业的课程为例,叙述了基于网络计划技术的教学计划编排方法。
Presents the courses scheme planning method based on network programming techniques and puts it into application in the specialty of building environment and equipment engineering.
公司计划同时采用多种方法来填补人员缺口,包括在公司网页上发布招聘广告、雇佣当地职介以及传媒网络。
The company plans to use a combination of approaches to fill the opening, including Posting the job on the company web site, hiring local employment recruiters and networking in board groups.
网络计划技术是工程项目计划管理的有效方法,也是管理系统工程中的一种主要的现代管理技术。
Network planning project is an effective way to plan project management technology. Also is an important modern management techniques for management of systems engineering.
本文介绍了一种用列表来设计计划网络图的新方法及其计算机程序。
This paper presents a new method for constructing the project network and its computer program.
最后,对模糊决策网络计划工期—成本优化方法进行了探讨。
At last, it studies the fuzzy duration-cost optimization of decision network planning.
网络计划技术是目前比较盛行的一种现代生产管理的科学方法。在各行业生产中应用广泛。
At present, network planning technique is a kind of scientific method of modem production management, which is widely applied.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
它之所以能取得高质高效的成绩,是由于在工程的设计、施工以及开通运营过程中采取了网络计划、浮拖法等一系列新技术、新方法、新措施和软科学研究。
The reason why the construction achieve high quality and efficiency is that a series of new technology and methods were applied in the designing and construction of the project.
作为一种先进的方法,网络计划技术在施工管理中应与横道图结合使用,在招投标工作中更应很好地运用。
As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
与IT技术结合的广义网络计划技术是现代管理学科中比较盛行的一种科学管理方法。
Generalized Internet planning technique associating with it is a scientific managing measure prevailing in modern management subjects.
本文还给出了一种简练的函数构造法,用该方法构造的函数能较好地逼近活动工期概率密度函数,方便了对计划网络图的计算机仿真运算。
It also gives a construction approach for approximating the probability density function of activity duration, which will facilitate the computer simulation of the PERT diagram.
根据网络计划的特点,在求解其最低费用日程时,引入最小割的概念,从而改进了该问题的求解方法。
According to the characteristic of network project, the concept of the Minimum Cut is introduced into the algorithm of the Least Cost Scheduling in network project so as to improve the approach.
以计划于2005年在南方电网的电力网络,例如,所提出的方法的有效性和鲁棒性进行了验证。
Taking the planned power network in the South power Grid in 2005 for example, the effectiveness and the robustness of the presented method are verified.
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
提供了采用该方法完成的项目网络计划生成实例。
The example for creating network schedule of project is given on.
引入浮动工时率的概念,提出了结合浮动工时率和网络计划工序拓扑排序的一种新的编码解码方法。
The concept of float rate was introduced. Integrating float rate with the toposorting of activities in network scheduling, a new method of coding and decoding was presented.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
For the purpose of practical use a unit commitment method considering transmission losses and line overload constraint is proposed in this paper.
基于网络计划是有机整体的观点,提出了协调施工网络计划及其应用方法,更符合施工实践。
In view of that network is an organic whole, author provides the coordinated construction network and its application more conforming to the practice.
基于网络计划是有机整体的观点,提出了协调施工网络计划及其应用方法,更符合施工实践。
In view of that network is an organic whole, author provides the coordinated construction network and its application more conforming to the practice.