• 编制进度计划——分析工序顺序、工序持续时间资源需求

    Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.

    youdao

  • 当然运行迁移需要仔细计划因此培训进度需要进行适当的调整适应编制测试有效的迁移计划所需时间

    Of course, run time migration does require careful planning and so the training schedule should be adjusted to accommodate the time required to assemble and test an effective migration plan.

    youdao

  • 负责按照业主要求,进行进度计划编制分级管理并指导督办施工单位遵照执行。

    Being responsible for programming and management in grade of operating schedule as per owner's requirement, guiding and inspecting the operating unit to carry it out.

    youdao

  • 编制计划可以很方便调整、优化施工进度计划,在施工控制阶段可以直接指挥生产控制施工进度

    It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.

    youdao

  • 编制生产部生产计划合理安排生产,跟进生产进度

    Compile the planning of product, arrangement of production reasonably, follow the production pace.

    youdao

  • 介绍P 3软件功能特点以及抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    youdao

  • 编制工程进度计划计划以控制阶段工期如期完成

    Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    youdao

  • PERT技术网络计划软件基于编制工程进度计划要求而开发种新兴的工程管理技术软件。

    Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.

    youdao

  • 海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    youdao

  • 通过及时提供可信信息适当的报告,支持有关编制预算、销售工作计划进度报告的工作。

    Establish budgets, Commercial Action Plans and progress reports, by giving timely reliable information and appropriate reports.

    youdao

  • 在对常规施工进度计划编制方法分析基础结合工程条件的特点,就进度计划编制技巧提出建设性探讨

    Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.

    youdao

  • 模式项目进度计划系统整体出发着重强调并行项目之间相互协调编制步骤分为项目结构分解、项目活动时间估算计划编制

    The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.

    youdao

  • 目前工程项目进度计划编制多采用网络计划方法

    Project network technique is presently a frequently-used method to make project schedule plan.

    youdao

  • 并且列举了计划实际成果。本文着重论述电网建设项目进度计划编制依据、方法内容以及在实际管理需要特别注意的问题

    It stresses the foundations, measures, contents of power grid project processing plan, while drawing construction plans, as well as the tips and major problems in management practice.

    youdao

  • 针对露天矿采掘进度计划优化编制问题,建立了个数学模型,同时较充分地考虑了作业条件下的模型建立和问题处理。

    An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.

    youdao

  • 施工设计包括清单工程量计算、工程量清单报价(商务)、施工技术标、施工进度计划施工平面图编制

    Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.

    youdao

  • 动态管理模型能够本着节约的原则编制资源供应计划进行资源使用效果分析配合进度计划改变资源投入

    The dynamic management model can workout resource providing plan by saving fundamental, and analyse there effect , assort the plan to change devotion.

    youdao

  • 基于国内外有关研究成果现阶段进度计划的实际编制方法,建立了一个动态进度计划编制模型,并用计算机进行程序实现。

    In this paper, a methodology is presented for making a dynamic progress schedule, and a macro program is written to automate this procedure.

    youdao

  • 开发出一套矿山人员接受微机上运行的软件,具体编制了某矿进度计划

    This software can be run in microcomputer and easy to be accepted by mine technical personnel.

    youdao

  • 提出核工程质量进度集成控制网络计划技术及其网络图模型,介绍了该网络计划编制和使用方法。

    The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.

    youdao

  • 施工进度计划根据公司劳动力资源SECCO对施工进度要求计划进行编制附录

    Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.

    youdao

  • 施工进度计划根据公司劳动力资源SECCO对施工进度要求计划进行编制附录

    Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.