编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
当然,运行时迁移也需要仔细的计划,因此培训进度也需要进行适当的调整,以适应编制和测试有效的迁移计划所需的时间。
Of course, run time migration does require careful planning and so the training schedule should be adjusted to accommodate the time required to assemble and test an effective migration plan.
负责按照业主要求,进行进度计划的编制和分级管理,并指导督办施工单位遵照执行。
Being responsible for programming and management in grade of operating schedule as per owner's requirement, guiding and inspecting the operating unit to carry it out.
在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。
It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.
编制生产部生产计划;合理安排生产,跟进生产进度。
Compile the planning of product, arrangement of production reasonably, follow the production pace.
介绍了P 3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。
The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.
编制工程进度月计划、周计划以控制阶段工期的如期完成。
Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.
PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。
Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
通过及时提供可信的信息和适当的报告,支持有关编制预算、销售工作计划及进度报告的工作。
Establish budgets, Commercial Action Plans and progress reports, by giving timely reliable information and appropriate reports.
在对常规施工进度计划编制方法分析的基础上,结合新工程条件的特点,就进度计划的编制技巧提出建设性探讨。
Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.
该模式的项目进度计划从系统整体出发着重强调并行项目之间的相互协调,其编制步骤可分为项目结构分解、项目活动时间估算及计划编制。
The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.
目前,工程项目进度计划的编制多采用网络计划方法。
Project network technique is presently a frequently-used method to make project schedule plan.
并且列举了计划的实际成果。本文着重论述了电网建设项目进度计划的编制依据、方法、内容以及在实际管理中需要特别注意的问题。
It stresses the foundations, measures, contents of power grid project processing plan, while drawing construction plans, as well as the tips and major problems in management practice.
针对露天矿采掘进度计划优化编制问题,建立了一个数学模型,同时较充分地考虑了作业条件下的模型建立和问题的处理。
An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
动态管理模型能够本着节约的原则编制资源供应计划,并进行资源使用效果分析,配合进度计划改变资源投入。
The dynamic management model can workout resource providing plan by saving fundamental, and analyse there effect , assort the plan to change devotion.
基于国内外有关研究成果和现阶段进度计划的实际编制方法,建立了一个动态进度计划的编制模型,并用计算机进行程序实现。
In this paper, a methodology is presented for making a dynamic progress schedule, and a macro program is written to automate this procedure.
开发出一套易为矿山人员接受的可在微机上运行的软件,具体编制了某矿进度计划。
This software can be run in microcomputer and easy to be accepted by mine technical personnel.
提出了核工程质量与进度集成控制网络计划技术及其网络图模型,介绍了该网络计划的编制和使用方法。
The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.
施工进度计划根据公司劳动力和资源及SECCO对施工进度要求的计划进行编制,见附录。
Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.
施工进度计划根据公司劳动力和资源及SECCO对施工进度要求的计划进行编制,见附录。
Construction progress schedule shall be worked out based on labor force and resources owned by company and the construction progress requirements of SECCO, see the appendix.
应用推荐