下面是组装和测试示例CBS的常规步骤。
Below are the general steps for assembling and testing the sample CBS. This article explains the tasks associated with each of these steps in detail.
JT8D-219发动机的组装和测试工作在普惠公司的康涅狄格州米德尔顿工厂进行。
The JT8D-219 engine is assembled and tested in Pratt & Whitney’s Middletown, Conn., facility.
本文通过设计制作“无源耦合组件组装与测试平台”解决耦合组件的组装和测试耗时过长和精度较低的问题。
We designed a assembling and testing bed for passive coupling assembly, which solved the problem of unreasonable long time and low precision of assembling and testing process.
然后集成开发人员可以在将业务流程部署到IBMWebSphereProcessServer之前对其进行组装和测试。
An integration developer can then assemble and test the business process before deploying it to IBM WebSphere process Server.
一旦对各个组件进行了单元测试,就很容易在应用程序中组装和连接这些组件。
Once each component is unit tested, it is easier to assemble and wire the components in the application.
通过这些示例,您将获得更多组装、部署、测试中介和基于消息的解决方案的经验。
By following these examples, you will have gained more experience with assembling, deploying, and testing mediations and message-based solutions.
现在就可以对其进行组装、部署和测试了。
现在就可以组装、部署和测试这个新的中介处理程序了。
You can now assemble, deploy and test this new mediation handler.
在完成了代码和单元测试之上,开发人员要为同级评审过程(后面被描述)组装一个评审包并等候反馈。
Upon completing the code and the unit tests, the developer assembled a review package for the peer review process (described later) and awaited feedback.
这一集成的开发环境能够帮助您快速的设计、开发、组装、测试和展开这些应用程序。
This integrated development environment helps you to rapidly design, develop, assemble, test, and deploy these applications.
这使得业务线用户能够专注于组装和连接复合应用程序,因为每个组件都已经进行过测试。
This allowed the line-of-business user to focus on assembling and wiring the composite application because each component had already been tested.
组装、部署和测试发送克隆的中介。
它为组装业务流程提供了一个图形化的编辑器和一个单元测试环境,可以在这个环境中执行和调试流程。
It provides a graphical editor for assembling business processes, and a unit test environment in which processes can be executed and debugged.
长征-5号火箭的全面原型准备在2012年和以后1年内进行测试,各级完全组装完成后,火箭的发射测试也将进行。
A full-scale prototype of the Long March 5 rocket would be ready for testing in 2012 and a year later, test firing of fully assembled rocket stages would be conducted.
组装阶段之后,产品接受检验和测试,然后才能包装、派送和销售。
After the assembly stage, the products are inspected and tested before they are packed and dispatched for sales.
您可以在一个小时以内完成组装、编程和测试工作。
You can put it together, program the demo, and test it out in less than an hour.
在工厂组装期间,采用机械设备对阀座和阀门测试封装挤压进行调整。
Adjustments for envelope squeeze on seats and valve testing are done by machine during factory assembly.
所有PVC或CPVC漂白剂球阀的制造商必须在进行工厂组装、测试和阀门包装之前全部完成所有的部件的生产。
The manufacturer of all PVC or CPVC bleach ball valves must complete all components prior to the factory assembly, test, and packaging of those valves.
在工厂组装期间,阀座的封装挤压和阀门测试的调整都是通过机械设备进行操作。
Adjustments for envelope squeeze on seats and valve testing are done by machine during factory assembly.
现在您应该已知道了使用中介的原因和场合,以及如何开发、组装、部署和测试简单的中介处理程序。
You should now know why and when to use mediations, as well as how to develop, assemble, deploy, and test a simple mediation handler.
此单元组的电工铺陈,组装,安装,测试,故障排除和修复建筑物和其他结构内的电线,灯具,控制设备及相关设备。
Electricians in this unit group lay out, assemble, install, test, troubleshoot and repair electrical wiring, fixtures, control devices and related equipment in buildings and other structures.
锅炉工制造,组装,架设,测试,维护和修理锅炉,容器,储罐,塔器,换热器和其他重型金属结构。
Boilermakers fabricate, assemble, erect, test, maintain and repair boilers, vessels, tanks, towers, heat exchangers and other heavy-metal structures.
计划和组织相关的预组装和功能测试和在车间装配过程中进行质量监测。
Plan and organise relevant pre-assembly; function test and in-process quality inspections during workshop assembly.
电子产品的组装,测试,维修和包装。
Assembling, testing, repairing and packing of electronic product.
转盘可以根据客户要求进行用以执行组装,程序和测试操作。
Dials can be custom configured to perform a combination of assembly, process, and test operations.
制造所主要包括组装厂和设计部门,从事光学设计,测试和安装。
The facilities include the main assembly and design facility where the instruments and optics designed, are tested and assembled.
利用组装的热释光光谱测量装置测试了天然与合成无色水晶、茶晶和紫晶样品的热释光,分析对比了其热释光图谱。
The thermoluminescent(TL) characteristics of the natural colourless rock crystal, tea-quartz, amethyst samples and their synthetic samples are tested by using the thermoluminescence metering device.
该致动器是一个电动液压装置,用于两个闸门,工厂组装,测试和检验。
This Superthrust Actuator is an electro-hydraulic unit dedicated to two valves; factory assembled, tested and calibrated.
电子工程技术员进行电子系统的测试,收集并分析数据,协助电子工程师和工程技术人员组装电路图。
Conducts tests of electronic systems, collects and analyses data, and assembles circuitry in support of Electronics Engineers and Engineering Technologists. Registration or licensing may be required.
它们组装、测试和发射的费用与美国同类设备相比要便宜40%。
They are as much as 40% cheaper to assemble, test and launch than rival American models.
应用推荐