• 扎渡水电站建设规模环境影响因素涉及面广

    The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect.

    youdao

  • 扎渡水电站大坝地段的河谷系数施工条件,上道路布置困难

    The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.

    youdao

  • 扎渡水电站地下引水发电系统不仅施工难度大而且施工工期干扰

    The construction of the underground water diversion and power generation system of Nuozhadu Hydropower Station is difficult and has a long construction period and many disturbance factors.

    youdao

  • 扎渡水电站工程规模巨大、枢纽工程地质条件复杂坝址右岸分布构造软弱岩带等。

    The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.

    youdao

  • 扎渡水电站工程规模巨大、枢纽工程地质条件复杂坝址右岸分布构造软弱岩带等。

    The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定