糯扎渡水电站建设规模大,环境影响因素多且涉及面广。
The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect.
糯扎渡水电站大坝所处地段的河谷系数小,施工条件差,上坝道路布置困难。
The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.
糯扎渡水电站地下引水发电系统不仅施工难度大,而且施工工期长、干扰多。
The construction of the underground water diversion and power generation system of Nuozhadu Hydropower Station is difficult and has a long construction period and many disturbance factors.
糯扎渡水电站工程规模巨大、枢纽区工程地质条件复杂,坝址右岸分布有构造软弱岩带等。
The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.
糯扎渡水电站工程规模巨大、枢纽区工程地质条件复杂,坝址右岸分布有构造软弱岩带等。
The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.