采用精密工程测量技术对EAST装置主机关键部件装配位置进行了装配过程检测,并建立了相应的测量控制网。
The technology based on the precise engineering survey has been adopted to control the key parts' assembly position of EAST tokamak.
采用精密工程测量技术对EAST装置主机关键部件装配位置进行了装配过程检测,并建立了相应的测量控制网。
The technology based on the precise engineering survey has been adopted to control the key parts' assembly position of EAST tokamak.
应用推荐