• 摘要: 近日,勃艮生产推出了新的勃艮起泡酒分级体系

    ABSTRACT: Burgundy producers have approved a new ranking system for Cremant de Bourgogne.

    youdao

  • 他们告诉9件事:垃圾站一次性纸巾很大空间生产过程消耗大量的

    What they don't tell you: it's true that disposable nappies occupy a lot of space in landfill sites and consume a fairly large amount of oil in their production.

    youdao

  • 现在生产速度每月2架直升机计划在2008年1季度每月增加3Lakota

    Current production rates are two helicopters per month and is scheduled to increase to three Lakota's monthly in the first quarter of 2008.

    youdao

  • Y代表生产x单位所用直接劳动时间

    Is the number of direct Labour hours to produce the XTH unit?

    youdao

  • 批量生产工作流程2执行一个任务(生产指令中提取需要生产产品清单)。

    Step 2 of the bulk-production workflow performs only one task (extracts a list of items from the production order).

    youdao

  • 多种工作流程2执行两个任务(生产指令中提取需要生产产品清单获取每一个所需产品流程细节)。

    Step 2 of the large-variety workflow performs two tasks (extracts a list of items from the production order and fetches process details for each item).

    youdao

  • 批量生产工作流程2粒度细,使得可以直接融合合并的工作流程中。

    The better granularity of Step 2 in the bulk-production workflow allows it to fit directly into the merged workflow.

    youdao

  • 如果生产部门一步发现生产指令包含多种生产产品就会跳过4步5步,直接跳入6

    If the production department finds that there the production order includes no large-variety products, it skips Steps 4 and 5 and jumps directly to Step 6.

    youdao

  • 2部分论述实现合并生产工作流程需要生产管理模式WSDL

    Part 2 will discuss the production-management schema and the WSDL that you require to implement your merged production workflow.

    youdao

  • 2部分将会示范如何使用WS - BPEL实现生产管理工作流程

    Part 2 will demonstrate how you can use WS-BPEL to implement a production-management workflow.

    youdao

  • 日本国内生产总值连续3个季度下滑,也是经济体35年来糟糕的季度经济表现。

    It was the third straight quarterly decline in Japan's gross domestic product and the economy's worst quarterly performance in 35 years.

    youdao

  • 流程 1投入生产运行

    Version 1 of the process is placed into production.

    youdao

  • 同样如果生产指令包含任何批量生产产品,不会执行678

    Similarly, if the production order doesn't include any bulk-production items, Steps 6, 7, and 8 are not to be performed.

    youdao

  • 接下来展示如何1部分清单2中的标记合并生产工作流程定义任务序列

    Now I'll show how to define the sequence of tasks in your merged production workflow using the tag that you saw in Listing 2 of Part 1.

    youdao

  • 例如比较多种工作流程2批量生产工作流程的2步。

    For example, compare Step 2 of the large-variety workflow with Step 2 of the bulk-production workflow.

    youdao

  • 两个39表示是2003 年39生产

    The first two numbers is 39, which is the 39th week of 2003.

    youdao

  • 当然我们没有任何系统生产但是我们计划在今年4季度发布系统,这两个系统都在一个J2EE容器中使用了Fabric3。

    We don't have any system in production yet, of course, but we have plans to release these two systems in Q4 this year using Fabric3 in a J2EE container.

    youdao

  • 完全获得或者生产的:8栏应当按照下列方式填写。

    Products not wholly produced or obtained: the entry in Box 8 should be as follows.

    youdao

  • 2部分示范如何ApacheODE保存合并的生产管理工作流程

    Part 2 will demonstrate how to host your merged production management workflow on Apache ODE.

    youdao

  • 2部分中,展开清单5标记示范如何使用WS - BPEL实现生产管理工作流程

    In Part 2, I'll expand Listing 5's and tags and demonstrate how you can use WS-BPEL to implement your production-management workflow.

    youdao

  • partnerLink给将要接收生产指令合作伙伴服务(1部分3中的总体WSDL文件)指定链接

    PartnerLink specifies a link to the partner service (the overall WSDL file shown in Figure 3 of part 1) that will receive the production order.

    youdao

  • 生产之前通过连续油管可以消除支撑剂未置换体积(相关技术参见2.4.3)。

    This underdisplaced volume of proppant will have to be removed by coiled tubing prior to production (see Section 2.4.3 for techniques).

    youdao

  • 对1999年1季度我国铁合金工业的生产、经营情况进行了较为详细统计、分析,并提出改进建议

    A detailed statistical analysis was made on the ferroalloy production and market status in the first quarter of 1999 at home. A suggestion for improving the status was presented.

    youdao

  • 其中包括两个中压电缆生产线一个高压电缆生产线,预计于2011年3季度完工。

    These include two mid-voltage power cables production lines and one high-voltage power cables production line, which are targeted for installation by 3Q2011.

    youdao

  • 我们已经生产2集装箱的产品全部生产了。

    We have been producing the products for 2nd container. All of the products are in production.

    youdao

  • 我们已经生产2集装箱的产品全部生产了。

    We have been producing the products for 2nd container. All of the products are in production.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定