结合我国秦山二期工程的具体情况,探讨了我们应该采取的对策。
In combination with the 2nd phase of Qinshan NPP, the countermeasure which should be adopted is inquired according to the developing tendency mentioned above.
秦山二期扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设。
The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.
介绍了秦山二期工程气动快速隔离阀的设计,着重谈了如何处理内泄漏问题。
This article describes the design of pneumatic quick isolation damper in No. 2 project of Qinshan Nuclear Engineering. Discusses how to deal with the problem of internal leakage.
介绍了秦山二期核电工程辅助给水除氧器的结构形式、主要功能、质量保证体系和制造工艺。
The structure, functions, quality control and manufacturing technology of auxiliary feedwater deaerator for Qinshan Nuclear Power Station, Stage Two are described.
介绍了反应堆堆芯中子源的功能,发射中子的原理以及秦山二期工程一次和二次中子源组件的结构和特点。
This paper described the function of neutron source assembly, the principle of neutron emission, and also described the structure and characteristics for primary and secondary neutron source assembly.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
阐述讨论了秦山二期650MW核电汽轮机在安装过程中的若干典型特点、所采取的特殊措施,以及遇到的主要问题和处理结果。
Some typical characteristics of Qinshan II 650MW nuclear steam turbine during installation were presented and special measures and major problems as well as their management results were introduced.
秦山核电二期工程堆芯测量系统采用计算机技术实现了对相关数据的自动采集、数据处理和信息显示。
With computer technology, the in-core instrumentation system of Qinshan phase II nuclear power plant can automatically perform parameter acquisition, data process and information display.
根据总体设计要求和设计输入要求,进行了秦山核电二期工程反应堆压力容器支承的结构设计和力学设计。
Structural and mechanical design are performed according to the requirement on the overall design and design input for the reactor pressure vessel support of Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
应用推荐