把所有的目标完成时间点写在你的进度表上,这样你对要完成的事情就有了确定的时间了。
Write these action points on a schedule so that you have definite dates on which to do things.
交货期限按照这里的附件3交货进度表确定。
Terms of Delivery are included in the Delivery Schedule in Appendix No. 3 hereto.
本文应用带记忆功能的模拟退火演算法,结合理论分析和经验法则,通过大量试验确定了一组有效的冷却进度表参数,成功地解决了这个复杂而特殊的背包问题。
By making use of simulated annealing algorithm with memory, and determining a set of effective cooling schedule, the thesis solves this complex and special knapsack problem successfully.
生产进度表将根据图纸上精确的时间进行编制。所有船厂采购物品确定后,明确船东供品。
Construction schedule will be issued when accurate dates for Drawings, OFE's is known and after (Builder) as finalised all procurement.
生产进度表将根据图纸上精确的时间进行编制。所有船厂采购物品确定后,明确船东供品。
Construction schedule will be issued when accurate dates for Drawings, OFE's is known and after (Builder) as finalised all procurement.
应用推荐