工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
应用推荐