加电自检顺利完成后马上进行网络连接配置。
The network connectivity configuration starts right after the POST completes smoothly.
执行POST(加电自检)来标识存在的设备并报告任何问题。
Perform POST (Power On Self Test) to identify the devices present and to report any problems.
工作站加电后,其加电自检程序将自动运行,我们只需按系统提示操作。
When the workstation is powered up, its poweron test program goes automatically and we just do as system prompts.
该步骤称为上电自检(power - on self - test,POST)。
描述思科路由器的运作过程(包括路由器初起过程,POST加电自检,路由器的物理组成)。
Describe the operation of Cisco routers (including: router bootup process, POST, router components).
设计了上电自检电路、热电偶信号处理电路、DSP与CAN总线接口电路以及电源电路。
Automatic detecting circuit, signal adjusting circuit, DSP and CAN peripheral port circuit and electrical source circuit are designed.
设计了上电自检电路、热电偶信号处理电路、DSP与CAN总线接口电路以及电源电路。
Automatic detecting circuit, signal adjust circuit, DSP and CAN peripheral port circuit and electrical source circuit was designed.
本文介绍建立高频电刀安全保障系统的必要性,以及该系统应具有的输出频率检测,时间检测和自检等功能。
This paper discusses the necessity of setting up the high frequency electrical knife safety system and its functions of the output frequency control, the time control and the self-test.
当CPU出现部分损坏时,这时机器加电时可能会出现显示器有图像出现,但是不能通过自检或者是无法加载系统。
That some damage when the CPU when the machine when power may occur when there is image display there, but can not or can not be self-loading system.
当CPU出现部分损坏时,这时机器加电时可能会出现显示器有图像出现,但是不能通过自检或者是无法加载系统。
That some damage when the CPU when the machine when power may occur when there is image display there, but can not or can not be self-loading system.
应用推荐