负荷预测和变电站规划是电网规划的基础。
Load forecasting and substation planning are the base of power distribution network planning.
北京为计划建设的充电站规划了两种模式。
Beijing has proposed two modes planned for the charging stations.
按规划预计,新建成的每座核电站平均贡献1000兆瓦,除此之外还有3000兆瓦的目标寄希望于其他可清洁能源。
Each nuclear station should generate an average of 1, 000 megawatts, while 3, 000 megawatts are expected to be generated from other renewable energy resources.
在日本,他说,规划人员在城镇的边缘安置了快速充电站,但是驾车者会专程赶过来充电因为这些位置被人们熟知。
In Japan, he said, planners put quick-charge stations on the edge of town, but motorists went out of their way to use them because their location was well-known.
撇开规划不说,相比用煤或煤气作燃料,核电站成本更高,建设周期更长,因而资金筹措也相当困难。
Planning aside, nuclear plants can be hard to finance, since they cost more and take longer to build than coal - or gas-fired units.
他解释道:“按照目前的规划,在沿海建造的大型核电站会越来越多,这些核电站容易受到海平面上升、洪水和风暴潮的袭击。”
He explained: "The current proposals will see a proliferation of very large nuclear facilities built at a number of coastal locations vulnerable to rising sea levels, flooding and storm surge."
其中一半的排放来自于核电站的规划和建造阶段,这个阶段它不得不依赖化石能源。
Half of those emissions are caused by the time it takes to plan and build a nuclear power plant - time during which fossil fuels have to be burnt for energy.
本论文主要研究城市电网规划方案,包括城市电网的负荷预测、变电站所址的规划、输电网架及其配电网的规划。
This paper researches in urban power network planning. It includes the load forecasting of urban power network, the site of the power stations, the transmission and distribution network planning.
计及环保因素,建立了变电站环保规划和电网环保规划模型。
Taking into account environmental factors, we establish the substation environmental planning and environmental planning model grid.
三峡水电站分配河南电网电力电量方案,不仅关系到河南电网的电源建设规划和调度运行,而且关系到三峡水电站电力电量效益的发挥。
The scheme of power supply not only relates to Henan power grid of power construction planning and dispatching& operation, but also relates to benefit of Sanxia hydro- power .
介绍乐滩水电站施工布置条件及施工总体布置规划。
Conditions and general layout planning for Letan Hydropower Station are presented.
文章最后给出了电站建设的总体规划。
Finally, the general planning building the station is briefly given.
该研究结果已被有关方面所采纳,对福建电网建设抽水蓄能电站的规划论证有一定的参考价值。
The results are accepted by the parties concerned, it will have the reference value to the planning and argumentation of building pumped-storage plant in Fujian in a certain extent.
本文研究一种模拟方法来定量地评估规划中的抽水畜能电站的事故备用效益。
This paper studied a kind of simulation method to evaluate quantitatively the emergency reserve benefit in pumped-storage station.
水电站水库群长期运行优化模型及其应用,是根据系统工程的思想,应用线性规划的方法建立起来的。
The optimization model and application of long-term operation of reservoir group of hydropower station were established in according to the system engineering and the linear programming methods.
本文阐述了水电站群径流补偿调节线性规划模型的思路、数学模型、算法和结构,并讨论了模型的目标函数问题。
This paper introduces the theory, the mathematical model, the algorithm, and the structure of a linear programing problem for runoff compensating regulation of a group of hydropower stations.
同时,本文还分析了制约梯级水电站各个因素,将原问题化为一个有约束非线性规划问题。
Besides, this paper have analyzed factors that restrict multi-reservoir system power station, and turn former problem into retrained non - linear planning problems.
本文根据动态规划原理,建立了梯级电站开发程序优化的数学模型,提出了相应的计算方法。
Based on the principle of dynamic programming, a mathematical model of sequencing programming of cascade hydropower stations is established and its computation method is presented.
龙首二级水电站是黑河水能梯级规划的第七座梯级电站。
Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.
冶勒水电站工程位于四川省凉山州冕宁县和雅安市石棉县境内,为南桠河流域梯级规划“一库六级”的第六级龙头水库电站。
Yele Hydroeletric Project, With the leading reservior station of Nanya river cascade development, is located on Nanya River in Mianning county and Shimian county of Sichun Province .
本文研究一种混联水电站水库群中长期优化调度的多维动态规划模型的求解方法。
In this paper a resolving method of multivariate dynamic programming model to mid and long term optimum operation for large scale hydropower system is studied.
提出了一种变电站两阶段优化规划方法。
This paper proposes a practical two-phase approach to substation optimization planning.
提出了一种变电站两阶段优化规划方法。
This paper proposes a practical two-phase approach to substation optimization planning.