本文以软件工程生命周期分析法为线索,描述了CMIS系统的开发过程。
This paper describes the development of CMIS according to requirement and sequence of software engineering.
主要分析方法:PEST外部因素分析法、波特五种力量模型、生命周期分析法、SWOT矩阵分析法。
The main research tools: the analysis of PEST external factors, Michael Porter 's Five factors Model, Life cycle analyses, and SWOT matrix.
论述了绿色建筑的内涵,比较了绿色建筑与一般建筑,应用生命周期成本法和造价分析法探讨了绿色建筑的价值理念。
Meaning of green building was discussed. Compared with generic building, both life cycle cost method and cost analysis method were adopted to discuss value and idea of green building.
从建筑的全生命周期出发,本文利用层次分析法(ahp)和BP神经网络法构建低碳建筑评价体系。
Starting from the full life cycle of the building, the article used AHP and BP neural network method to build the low-carbon architecture evaluation system.
运用全生命周期分析方法对产品的性能进行分析,采用线性标度法和层次分析法建立产品全生命周期评价模型。
Life cycle assessment was used to evaluate the performances of product, and linear scale and analytic hierarchy process were applied to establish the model for product life cycle assessment.
介绍了在影响评价中确定权重的三种方法,即专家法、层次分析法和线性回归方程法,为今后进行生命周期影响评价和研究提供了依据。
The paper introduced three methods, which decide weight in life cycle impact assessment, i. e. Delphi technique, analytic hierarchy process and linearity regress technique.
介绍了在影响评价中确定权重的三种方法,即专家法、层次分析法和线性回归方程法,为今后进行生命周期影响评价和研究提供了依据。
The paper introduced three methods, which decide weight in life cycle impact assessment, i. e. Delphi technique, analytic hierarchy process and linearity regress technique.
应用推荐