典型的现场变更记录非正式表包括于附录7中。
The pro forma for a typical Field Change Record has been included in Appendix 7.
施工现场签证不同于设计变更。
经操作员和软件支持业务人员(SSF)现场测试,对发现、过滤的软件故障进行确认,生成s 2级的软件系统问题变更报告(PCR)。
Operators and software Support Facility (SSF) conducted on-site tests and validated those found and filtered software failures, generated S2 level software system Problem Change Reports (PCR).
上料台架及东西向运输轨道位置,根据现场实际情况可作相应变更调整。
On anticipates that a shelf and a thing is to the transportation track place , The relevant alternation regulation may be do on the basis of the actual situation of field .
现场工作人员保留修改,解释,变更规范的权利,并可拒绝任何不适当的人员入场。
Our staff reserves the right to revise, interpret, or change the rules, and the right to refuse admission of any person who behaves inappropriately.
现场工作人员保留修改,解释,变更规范的权利,并可拒绝任何不适当的人员入场。
Our staff reserves the right to revise, interpret, or change the rules, and the right to refuse admission of any person who behaves inappropriately.
应用推荐