为了充分利用液氢的低温火用,在氢能燃气轮机循环中附加了一个空气预冷器和氢气透平。
To fully utilize the low temperature exergy of liquid hydrogen, installed additionally in a hydrogen energy based gas turbine cycle is an air precooler and hydrogen turbine.
本文以某型燃气轮机透平第一级叶片的二次空气系统为研究对象。
In this thesis, the first stage secondary air network system of a gas turbine is studied.
根据燃气轮机透平叶片冷却的实际情况,引入并完善叶片冷却的计算模型,并采用文献报道的数据验证计算模型的正确性。
Based on the gas turbine blade's practical cooling condition, a blade cooling computation model is introduced and perfected, and its validity is verified using reported data.
燃气轮机效率的提高,主要表现在透平初温的提高。
The increase of the gas turbine work ratio is mostly demonstrated by the increase of the turbine initial temperature.
西门子1s. V94.3 A型燃气轮机组透平岛辅助系统工艺设计探讨。
Engineering Design of Turbine Train Island Accessory System of Siemens 1s. V94.3A Type Gas Turbine Generating Unit.
主要用于燃气轮机、蒸汽透平机、空分设备、空压设备、发电机组等大型设备的噪声治理。
The sound reduction hood is mainly used in gas turbine, steam turbine, air separation plant, air compressor, generator set and other large-scale equipment for noise control.
用通用有限元计算程序ANSYS对某燃气轮机启动过程中透平第一级涡轮盘的三维模型瞬态温度和应力场进行计算。
The transient temperature and stress field during starting of a turbine first stage disc's 3-dimensional model has been calculated by using the general finite element calculation program ANSYS.
用通用有限元计算程序ANSYS对某燃气轮机启动过程中透平第一级涡轮盘的三维模型瞬态温度和应力场进行计算。
The transient temperature and stress field during starting of a turbine first stage disc's 3-dimensional model has been calculated by using the general finite element calculation program ANSYS.
应用推荐