这个小瀑布工程据说完全由大帝本人想出。
The project of this cascade was thought over thoroughly by the emperor.
超大型瀑布工程因其规模大,存在许多技术难题,这些问题往往要通过建立造型效果的水工模型试验确定一些技术参数。
Various technical problems and design parameters to construct a super large artificial waterfall could be solved and determined best by an established real shape hydraulic model.
如果建在墨脱,那么这个工程将包含一系列渠道、管道、水库和涡轮发电机,这将使雅鲁藏布江进入印度前,形成一个壮丽的高达2000米的大瀑布。
The former would involve the construction of a series of tunnels, pipes, reservoirs and turbines to exploit the spectacular 2, 000-metre fall of the river as it curls down towards India.
传统的软件工程方法如瀑布模型,存在以下问题1:需求或设计中的错误往往只有到了项目后期才能够被发现。
Traditional software engineering has some disadvantages such as follows 1: defects exist in the requirement and designing only can be found in the late of the project.
结合瀑布沟大桥工程实际,详细介绍了无塔架缆索吊机的设计方法和无塔架缆索吊装预制横梁及吊杆的安装技术。
Based on the practice of Pubugou Large Bridge, the technology of non-tower cable lifting prefabricated transverse beam and rod installation is introduced in detail.
接地工程犹如瀑布或流失。
大渡河瀑布沟水电站(3300MW)是国家“十五”计划的重点工程项目。
Pubugou Hydropower Station (3300 MW) on Dadu River is a key project fixed in the national 10th Five-Year Plan.
大渡河瀑布沟水电站(3300MW)是国家“十五”计划的重点工程项目。
Pubugou Hydropower Station (3300 MW) on Dadu River is a key project fixed in the national 10th Five-Year Plan.
应用推荐