• 向家坝溪洛两电站为金沙江开发第一工程

    Xiangjiaba and Xiluodu hydroelectric stations will be the first stage works of developing the Jinshajiang River.

    youdao

  • 工程建设风险引起重视管理手段更加精细。

    The Engineering venture of Xiluodu project shall be attached importance to and ladder of management should be finer.

    youdao

  • 洛渡向家坝水电站开发金沙江水能资源重点工程

    The Xiluodu and Xiangjiaba hydroelectric stations are the key projects of developing the Jinsha River hydropower resources.

    youdao

  • 主要介绍了特征线溪洛渡泄洪洞流鼻设计中的应用情况。

    Application and research of method of characteristics in design of flip bucket for spillway tunnel at Xiluodu Hydropower Project is mainly presented.

    youdao

  • 洛渡水电站泄洪具有河谷狭窄、泄洪流量、泄洪水头的特点。

    The flood discharge and energy dissipation of Xiluodu Hydroelectric Plant are characterized with narrow valley, big flood discharge capacity and high head.

    youdao

  • 金沙江溪洛渡水电站巨型水电站,发育一冲推覆构造——马家河坝断层

    The Xiluodu Hydropower Station on the Jinsha River is a giant hydropower station, but a thrust nappe structure-Majiahe Dam fault-lies in the reservoir head region.

    youdao

  • 多种检测方法溪洛水电站当地玄武岩人工骨料活性进行大量试验研究

    A large number of experiment studies are performed for basalt crushed aggregate alkali activity by different test methods at site of Xiluodu hydropower station.

    youdao

  • 此外本文溪洛拱坝进行应力模型试验研究,给出了试验得到应力、变位结果

    Furthermore, model test of Xiluodu's high arch dam is studied and the. Result of stress and displacement is presented in this paper.

    youdao

  • 溪洛渡水电站是以发电为主,兼有沙、防洪、漂木、航运综合利用效益巨型水电站;

    Xiluodu Waterpower Project is a large multi-purpose project with main purpose of power generation, and other functions of the project are silt arresting, flood control, log passing and navigation.

    youdao

  • 电站装机1260万千瓦相当于4个二滩电站,工程综合技术难度位居世界前列。

    The total installed capacity of Xiluodu hydropower station amounts to 12600MW that is 4 times of Ertan station, and its comprehensive technical difficulty is on top of the world.

    youdao

  • 溪洛水电站金沙江干流拟建座仅次于三峡大型水利枢纽,电站坝址区水文地质条件复杂。

    Xiluodu hydropower station is a proposed large scale key water control project located on the mainstream of Jinshajiang river, second only to the Three Gorges project.

    youdao

  • 溪洛渡水电站工程重要性混凝土耐久性方面考虑,工程严格控制水泥含量及混凝土中的

    Taking into consideration of importance of Xiluodu project and concrete durability, alkali content in cement and total alkali content in concrete must be limited strictly.

    youdao

  • 针对洛渡水电站导流洞衬砌混凝土工程采用三维有限元分析围岩变形模量变化温度应力影响敏感性

    In view of the lining concrete engineering of Xiluodu hydropower station, 3-dimensional finite element method is used to analyze thermal stress sensitivity of the surrounding rock deformation modulus.

    youdao

  • 此基础上确定了溪洛渡株洲特高压直流输电工程换流变压器额定功率电压电流接头的变化范围参数

    After illustrating the operation theory of six pulse converter, author gives the calculating method of UHVDC transmission parameters such as operating power, voltage, current and tap changer range.

    youdao

  • 重力相似准则建立1:25溪洛渡泄洪洞模型事故闸门水力相似模型,研究了事故闸门动水闭门持住力和动水启

    Some results are as follows:(1) A 1:25 scale model was built following the gravity similarity criterion. The gate closing and opening force in hydrodynamic conditions was studied.

    youdao

  • 重力相似准则建立1:25溪洛渡泄洪洞模型事故闸门水力相似模型,研究了事故闸门动水闭门持住力和动水启

    Some results are as follows:(1) A 1:25 scale model was built following the gravity similarity criterion. The gate closing and opening force in hydrodynamic conditions was studied.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定