• 浇筑式沥青混凝土墙多用于,易于施工。

    The core wall of asphalt concrete with placement was applied to low clam.

    youdao

  • 沥青混凝土堆石坝石坝主要之一

    Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.

    youdao

  • 介绍沥青混凝土墙基座垫层配合比试验研究方法

    This paper describes a test study method of mat base material mix for asphalt concrete core wall.

    youdao

  • 尼尔基水利枢纽工程主坝结构形式为沥青混凝土砂砾石坝

    The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.

    youdao

  • 碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.

    youdao

  • 碾压式沥青混凝土以及过渡带施工主坝坝体填筑同步进行的。

    The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...

    youdao

  • 碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    youdao

  • 茅坪溪防护三峡工程坝,也是目前中国最高沥青混凝土墙坝。

    Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.

    youdao

  • 尼尔基工程主坝沥青混凝土石坝,主坝工程施工采用两期导流方式。

    The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.

    youdao

  • 尼尔基工程主坝沥青混凝土石坝,主坝工程施工采用导流方式

    The major dam of Nierji water project is an earth - rockfill dam with asphalt concrete core. The construction diversion is used two stages.

    youdao

  • 三峡茅坪溪防护石坝沥青混凝土骑缝碾压施工工艺国内首创的施工方法。

    This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.

    youdao

  • 对该围堰混凝土结构特点进行了探讨,并设计方案提供了论证建议

    The features of concrete cores of this cofferdam are studied. Besidies, Some suggestions and verifications are put forward for design scheme.

    youdao

  • 大坝主体由堆石坝或砾石组成支撑作用中间设置沥青混凝土防渗作用。

    The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.

    youdao

  • 温度垂向流向三个方面分析马家沟水库大坝河床沥青混凝土渗漏情况

    Analyzes the leakage from the asphalt concrete core wall on the river-bed section of Majiagou reservoir from the aspects of temperature, vertical current and current direction.

    youdao

  • 斜坡堤内设置刚性混凝土墙板增加消浪效果防止泥沙进入港内的一种尝试

    It was a new attempt to put a core wall which sit in rubble mound break - water to get good effect of wave attenuation and stop silt and sand from entering a part.

    youdao

  • 文中还讨论了考虑湿影响有限元计算方法进行了土石坝沥青混凝土墙的分析

    In the paper, the finite element method regarding the effects of wetting and creep analysis of asphalt concrete core are studied.

    youdao

  • 研究结果可供大坝蓄水计划参考,水头沥青混凝土运行提供一定的参考。

    These results can be referenced to the plan of water level procedures on the dam; and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied.

    youdao

  • 无损检测钻孔取检测,碾压沥青混凝土心容重、孔隙率和渗透系数均满足设计要求

    Nondestructive detection and core sample detection show that the unit weight, porosity and permeability of the core are in accord with the design requirement.

    youdao

  • 拦河主坝坝当地材料砂砾为主防渗比较粘土墙、沥青混凝土墙和斜墙型式

    The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.

    youdao

  • 文章结合塑性混凝土赤水水库除险加固工程应用分析塑性混凝土心墙的施工技术要点

    In line with the applications of the technique of the plastic concrete core wall in Chishui Reservoir reinforcement engineering, the article analyzes the key points of this technique.

    youdao

  • 全面掌握这些特征无论沥青混凝土墙堆石坝正确设计还是合理施工,无疑都帮助的。

    It is assuredly helpful to well know these characteristics for either proper design of rockfill dam with bituminous concrete core, or reasonable construction.

    youdao

  • 碾压沥青混凝土将热后的沥青混合料按一定厚度摊铺铺筑部位上,然后适当的振动碾压成型。

    Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.

    youdao

  • 庄水库防渗墙加固工程所需高性能混凝土,要求和易早期强度后期强度性能好、低高抗拉强度。

    The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.

    youdao

  • 采用单摆垂直轨道装置进行混凝土体对碰撞试验

    Central impact tests between concrete blocks are performed by a pendulum test system and a drop weight test system.

    youdao

  • 实践表明,浇筑式沥青混凝土适用寒冷地区石坝防渗

    The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.

    youdao

  • 通过最终确定为单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土快速施工

    Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.

    youdao

  • 通过最终确定为单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土快速施工

    Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.