我们看到“系统工程师”会对一切事情负责,从计划到需求获取,到架构获取,到集成再到测试。
We've seen "Systems Engineers" responsible for everything from planning, to requirements elicitation, to architecture capture, to integration and testing.
指南的开发和执行是过程工程师们的共有责任,并且应当是与主测试计划是一致的。
The development and enforcement of the guidelines is the Shared responsibility of the process engineers and should be consistent with the master test plan.
为了研究环境风险并允许波浪能量工程师对他们的发明进行测试,Von Jouanne和俄勒冈州立大学的同事们(包括Boehlert),正在附近建一座浮动的测试锚位计划明年投入使用。
To study the environmental risks and allow wave-energy engineers to test their inventions, she and colleagues at Oregon State, including Boehlert, are building a floating test berth nearby.
和产品(平台)工程师,测试工程师,新产品导入工程师一起根据质量计划创建D PU报告。
Work with platform engineer, test engineer and NPD manufacturing engineer to create DPU report according to quality plan in NPD DB.
严格的按照软件工程师拟定的操作指导书执行测试计划,认真和规范的记录实验数据。
Execute test plan seriously according to the operation instructions from Firmware Design Engineer, and carefully record all data with right format.
涉及到和过程流程图,控制计划,工作指令,测试指令,包装指令等,质量工程师的工作。
Involve into and work with Quality Engineer on the process flow chart, Control Plan, Working instruction, Testing instruction, packaging instruction and so on.
目前工程师们正在着手研发“抗绞拧翼梁机翼”,他们计划在今年夏季晚些时候进行飞行测试。
Engineers are currently developing what Icon refers to as a "spin-resistant wing" which they plan to flight test later this summer.
这块用砂石和花岗岩碎块制作的0.8公顷模拟月球表面,让工程师们可以为了美国太空总署(NASA)重返月球的计划而对各种系统和概念进行测试。
The 2-acre (0.8-hectare) mock moon surface, made of sand and crushed granite, allows engineers to test systems and concepts as they prepare for NASA's return to the moon.
这块用砂石和花岗岩碎块制作的0.8公顷模拟月球表面,让工程师们可以为了美国太空总署(NASA)重返月球的计划而对各种系统和概念进行测试。
The 2-acre (0.8-hectare) mock moon surface, made of sand and crushed granite, allows engineers to test systems and concepts as they prepare for NASA's return to the moon.
应用推荐