• 阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝坝顶表孔泄洪能。

    Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.

    youdao

  • 一般是拱坝泄洪主要通道,具有口数量、结构尺寸、受力状态复杂的特点。

    Surface outlet is the main discharge channel of high arch dam. Usually many surface outlets of large size are constructed on a high arch dam; their stress conditions are quite complicated.

    youdao

  • 一般是拱坝泄洪主要通道,具有口数量、结构尺寸、受力状态复杂的特点。

    Surface outlet is the main discharge channel of high arch dam. Usually many surface outlets of large size are constructed on a high arch dam; their stress conditions are quite complicated.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定