没有人想直接从消防水管处直接喝水。
以上措施,可以有效降低进出水管处造成的混水问题。
The above measures can effectively reduce the problems caused by the water inlet pipe.
如果你想替换弹出式排水管,你可用可调式扳手拆除连接排水管和法兰的螺丝,然后从T型三通处拆掉排水法兰。
Unscrew the nut that connects the drain to the flange using an adjustable wrench if you are replacing the pop-up drain. Then remove the drain flange from the T-connector.
如果水管破裂,请在主控阀处切断水流。
If water pipes are damaged, shut off the supply at the main valve.
将给水管与水龙头的进水端连接,在给水总阀处缠绕生料带,然后连接给水管与总阀。
Connect the supply lines to the inlet pipes on the faucet, wrap Teflon tape around the shutoff valve connections, and connect the other ends of the supply lines to the shutoff valves.
天沟和排水管被仔细安装进建筑物表层,镀锌钢板在边角处折叠卷起,隐藏了窗框,并打褶形成防水条。
Roof gutter and drainpipes have been carefully integrated into the surface, the galvanised fabric folds sharply over corners, tucks away window framesand pleats into a weather bar.
空气压缩机淡水冷却器的海水管接口处发现渗漏。
The sea-water pipe outlet of air compressors fresh water cooler found leaking.
将水管或铅管装置充满水或气,而后观察量压器,以查出漏水处。
Filled pipes or plumbing fixtures with water or air and observes pressure gauges to detect and locate leaks.
所有水管路的进口和出口名称必须清楚的钢印在其支撑架处。
All water line inlets and outlets to be stamped clearly on retainer.
检查水管中段到水管两端束环处是否感觉有任何不同的异状。
Check for any difference in feel between the middle and the ends of the hose.
如果感觉水管两端(束环处算起两英吋处)是软软的,应立即更换水管。
If the ends feel mushy, the hose should be replaced immediately.
但管外还要包隔热层而且电线管在两处要与35毫米的冷水管交叉,地方恰好不够。
And in two places I need to cross a conduit with a 35 millimetres cold feed pipe.
紧接着,车头的冲水管也往外淌水,最后连车身的连接管处也“忍不住”往外吐水。
Then, the front of the flush pipes are out Tangshui, finally even the body of the connecting pipe Department also "can not help but" spit out water.
供、排水系统:从车间外墙外1米处的接点至用水设备的供水、排水管道。
Water supply and drainage system: the water supply and drainage piping from the joint at 1m from the workshop outside wall to water users.
一天晚上,水管破裂处宿舍。
排水管:无缝钢,在泵支撑板处支撑,在外壳连接处配有膨胀部件,以防止作用在泵上的张力。
Discharge Pipe: Seamless steel, supported at the pump support plate and furnished with an expansion fitting at the casing connection to prevent strain on the pump.
但管外还要包隔热层而且电线管在两处要与35毫米的冷水管交叉,地方恰好不够。
But they 've got to be wrapped in lagging, remember. and in two places I need to cross a conduit with a 35 millimetres cold feed pipe. There's just not enough space.
上下水管道与地面连接处用刷子涂覆施工。
The upper and lower water pipe connected with the ground at the construction coated with the brush.
上下水管道与地面连接处用刷子涂覆施工。
The upper and lower water pipe connected with the ground at the construction coated with the brush.
应用推荐