• 布巴拉水电位于弗朗斯维尔市以南50公里,中国水利水电建设集团承建的加蓬最大的水电项目

    The Upper Trishuli 3A Hydroelectric Project was build by China Gezhouba Group Co. Ltd.

    youdao

  • 水电建设项目工程档案分类方案编制工程文件归档整理、卷的关键问题之一

    For hydropower construction projects, achieves classification and number preparation is a critical issue in sorting-out and voluming of project documents.

    youdao

  • 随着我国水电事业的迅猛发展为了提高水电工程建设管理水平需要大力推进工程项目总承包机制。

    With the rapid hydroelectric development and in order to advance the construction management level of hydropower project, which needs to advance the general contract project.

    youdao

  • 水利水电建设项目不可预见因素因而存在着一定风险

    There are many contingent factors in water conservancy and hydropower construction, thus there are certain risks in it.

    youdao

  • 国内首例获得岩溶水流类型结构规模成果用于水电建设大型示踪探测项目

    This is the first large tracer detecting project utilizing results of the type, structure and scale of groundwater stream field on hydropower construction.

    youdao

  • 摘要招标投标管理制度作为工程承包发包主要形式我国水电工程项目建设广泛实施

    Abstract: the tendering and bidding management system, as the main form of contract project, has been implemented in the construction of hydropower project in our country.

    youdao

  • 用于道路修筑、水电工程农田改造、港口建设矿山开发其它建筑工程项目的土石方作业。

    It is applicable for road construction, water and electricity engineering farmland leveling, port building, mining and other engineering conditions.

    youdao

  • 水电建设项目国民经济中的地位作用日益增强

    The water conservancy and power industry to strengthen increasingly in the position and the function in the national economy.

    youdao

  • 简述水利建设项目进行贷款能力测算目的必要性,介绍贷款能力测算巴江口水电站中的应用。

    The author briefly introduces the purpose and necessity of calculation of loan capability for water and power project.

    youdao

  • 项目选址水电供应配套政策支持项目建设工作做好

    Project site selection, utilities (water and power) supply, policy supports and such other project construction jobs have been conducted.

    youdao

  • 水电建设项目立项设计实施全过程存在上述确定因素,即水电工程建设项目风险

    The uncertainties above existing during the process of establishing, designing and implementing the hydropower construction project are the risks of the hydropower construction project.

    youdao

  • 水利水电工程建设离不开设计,设计质量好坏在很大程度上将制约项目成败国际水利水电EPCT项目更是如此。

    It is impossible to construct water and hydropower project without design. It will make the success or fail of the project to a great extent, which is no exception to an international project.

    youdao

  • 水利水电工程建设离不开设计,设计质量好坏在很大程度上将制约项目成败国际水利水电EPCT项目更是如此。

    It is impossible to construct water and hydropower project without design. It will make the success or fail of the project to a great extent, which is no exception to an international project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定