• 如果要在一个不好地基建造道路可能要通过挖掘去除潮湿有机其他不合适物质,也可能水泥混合或者地质纺织面料进行处理

    If a path is constructed over a poor sub-grade, excavation to remove wet, organic or otherwise unsuitable material, treatment with soil-cement or application of a geotextile fabric may be required.

    youdao

  • 这种护坡材料水泥混合而成。水泥7~15%,水泥拌和。

    The material is a mixture of soil, water, and cement. cement is 7~15 percent the weight of dry materials mixed with sandy loam or gravel soil. water added is 10% or so.

    youdao

  • 这种护坡材料水泥混合而成。水泥7~15%,水泥拌和。

    The material is a mixture of soil, water, and cement. cement is 7~15 percent the weight of dry materials mixed with sandy loam or gravel soil. water added is 10% or so.

    youdao