• 通过工程实例介绍水平定向穿越敷管施工工艺技术要求借以说明该技术优点

    By project case, the paper shows advantages of horizontal directional crossing pipelaying by its construction process and technical requirements.

    youdao

  • 水平定向钻孔(HDD)常常管道穿越河流湿地障碍优先选用方法插图表示河流穿越典型情况

    HDD is often the preferred method for constructing the pipeline across such obstacles as streams or wetlands. (See inset diagram.) Here is shown a typical river crossing.

    youdao

  • 水平定向穿越管道回拖环节,容易出现现象导致穿越失败,造成巨大的经济损失

    Pipe sticking phenomenon appears sometimes during pull-back stage of pipeline crossing with horizontally directional drilling, which results in crossing failure and great economic loss.

    youdao

  • 水平定向穿越管道回拖环节,容易出现现象导致穿越失败,造成巨大的经济损失

    Pipe sticking phenomenon appears sometimes during pull-back stage of pipeline crossing with horizontally directional drilling, which results in crossing failure and great economic loss.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定